Solar power plant, Michigan
Willford Solar, LLC power plant, Michigan
Willford Solar, LLC is a 20 MW solar power plant in Gladwin County, Michigan, operated by Willford Solar, LLC, and it generated 41,138 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 53rd percentile of U.S. solar plants. By 2025 generation it ranks 4,328th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Willford Solar, LLC plant run compared with other solar plants?
The Willford Solar, LLC plant had a capacity factor of 23% in 2025 on 20 MW of net summer capacity, the 53rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 86 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Willford Solar, LLC | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Willford Solar, LLC plant generating more or less than last year?
Generation at Willford Solar, LLC rose 21.9% from 2024 to 2025, from 33,749 MWh to 41,138 MWh.
| Period | MWh |
|---|---|
| 2024 | 33,749 |
| 2025 | 41,138 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 951 |
| November 2025 | 1,626 |
| October 2025 | 3,385 |
| September 2025 | 4,034 |
| August 2025 | 5,233 |
| July 2025 | 5,541 |
| June 2025 | 4,980 |
| May 2025 | 4,540 |
| April 2025 | 4,080 |
| March 2025 | 3,503 |
| February 2025 | 2,109 |
| January 2025 | 1,156 |
| December 2024 | 677 |
| November 2024 | 1,033 |
| October 2024 | 2,322 |
| September 2024 | 4,439 |
| August 2024 | 3,970 |
| July 2024 | 5,028 |
| June 2024 | 4,000 |
| May 2024 | 3,748 |
| April 2024 | 2,862 |
| March 2024 | 2,529 |
| February 2024 | 2,457 |
| January 2024 | 684 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Willford Solar, LLC plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WIL20 | Operating | Solar Photovoltaic | 20 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Willford Solar, LLC plant?
EIA lists no joint owners for Willford Solar, LLC. Willford Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Willford Solar, LLC plant?
Willford Solar, LLC is in Gladwin, Gladwin County, Michigan, at 43.9885° N, 84.5223° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Michigan are similar in size?
Michigan has 70 operable solar plants with 1,967 MW of capacity, and Willford Solar, LLC's 20 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Midcontinent Solar, LLC | Shiawassee | 20 | 37,621 |
| Greenstone Solar, LLC | Branch | 20 | 35,352 |
| Shipsterns Solar, LLC | Calhoun | 20 | 40,817 |
| Willford Solar, LLC | Gladwin | 20 | 41,138 |
| Turrill Solar Farm | Lapeer | 20 | 20,213 |
| Delta Solar Power II | Eaton | 16 | 25,323 |
| Electric City Solar | St Joseph | 15 | 23,837 |
Source: EIA Forms EIA-860 and EIA-923, 2025.