Williams coal power plant, South Carolina

Williams is a 660 MW coal power plant in Berkeley County, South Carolina, operated by South Carolina Genertg Co, Inc, and it generated 2,447,008 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.4% of the generation reported in South Carolina, and its capacity factor sits at the 43rd percentile of U.S. coal plants. By 2025 generation it ranks 447th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

660 MWNameplate capacity
46%Capacity factor, 2025, 43rd percentile, on 605 MW net summer
2.4%Of SC generation, 2025
52 yearsAverage generator age, by MW

How hard does the Williams plant run compared with other coal plants?

The Williams plant had a capacity factor of 46% in 2025 on 605 MW of net summer capacity, the 43rd percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 168 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Williams46%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Williams plant generating more or less than last year?

Generation at Williams rose 28.9% from 2024 to 2025, from 1,898,619 MWh to 2,447,008 MWh. Through August 2026 it is running 4.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20241,898,619
20252,447,008
2026 through August1,662,059
2025, same months1,587,707
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026286,435
July 2026310,064
June 2026147,925
May 202670,979
April 2026240,073
March 2026206,778
February 2026116,567
January 2026283,238
December 2025226,101
November 2025109,219
October 2025287,454
September 2025236,527
August 2025177,029
July 2025263,033
June 2025257,928
May 2025257,602
April 2025153,947
March 20250
February 2025186,243
January 2025291,925
December 2024104,263
November 2024190,608
October 2024182,880
September 2024219,521
August 202490,689
July 2024211,072
June 2024200,262
May 20246,457
April 2024111,461
March 2024187,444
February 2024165,671
January 2024228,291

Source: EIA Form EIA-923, through August 2026.

How much of South Carolina's electricity comes from the Williams plant?

Williams made 2.4% of the 103,930,530 MWh reported by South Carolina plants in 2025, from 2.4% of the state's 27,220 MW of capacity. By capacity it is the 17th largest of 215 plants in South Carolina, the 537th largest of 14,327 in the U.S. and the 98th largest of 195 coal plants. By 2025 generation it is the 11th largest of 197 generating plants in the state.

Williams within South Carolina, 2025
MeasureThis plantSouth CarolinaShare
Capacity (MW)66027,2202.4%
Generation (MWh)2,447,008103,930,5302.4%
Coal capacity (MW)6605,15912.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Williams plant, and when do they retire?

1 operable generator totals 660 MW, with an average age of 52 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 2 have already retired, totalling 53.8 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s1660100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ST1OperatingConventional Steam Coal6601973n/a
1RetiredNatural Gas Fired Combustion Turbine2719722022
2RetiredNatural Gas Fired Combustion Turbine2719722022

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Williams plant?

EIA lists no joint owners for Williams. South Carolina Genertg Co, Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Williams plant?

Williams is in Goose Creek, Berkeley County, South Carolina, at 33.0158° N, 79.9297° W. It sits in the Dominion Energy South Carolina balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which coal plants in South Carolina are similar in size?

South Carolina has 4 operable coal plants with 5,159 MW of capacity, and Williams' 660 MW is 13% of that.

Coal plants in South Carolina around this size
PlantCountyMW2025 MWh
WinyahGeorgetown1,2764,196,582
WatereeRichland7722,383,086
WilliamsBerkeley6602,439,771