Wind power plant, South Dakota
Willow Creek Wind Power LLC power plant, South Dakota
Willow Creek Wind Power LLC is a 105 MW wind power plant in Butte County, South Dakota, operated by Willow Creek Wind Power LLC, and it generated 374,200 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.7% of the generation reported in South Dakota, and its capacity factor sits at the 78th percentile of U.S. wind plants. By 2025 generation it ranks 1,683rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Willow Creek Wind Power LLC plant run compared with other wind plants?
The Willow Creek Wind Power LLC plant had a capacity factor of 41% in 2025 on 104 MW of net summer capacity, the 78th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 151 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Willow Creek Wind Power LLC | 41% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Willow Creek Wind Power LLC plant generating more or less than last year?
Generation at Willow Creek Wind Power LLC rose 0.4% from 2024 to 2025, from 372,828 MWh to 374,200 MWh. Through August 2026 it is running 10.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 372,828 |
| 2025 | 374,200 |
| 2026 through August | 264,025 |
| 2025, same months | 238,239 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 17,795 |
| July 2026 | 31,216 |
| June 2026 | 34,357 |
| May 2026 | 37,352 |
| April 2026 | 35,940 |
| March 2026 | 33,628 |
| February 2026 | 34,227 |
| January 2026 | 39,510 |
| December 2025 | 43,074 |
| November 2025 | 31,144 |
| October 2025 | 40,159 |
| September 2025 | 21,584 |
| August 2025 | 20,421 |
| July 2025 | 21,980 |
| June 2025 | 22,001 |
| May 2025 | 28,226 |
| April 2025 | 30,004 |
| March 2025 | 36,747 |
| February 2025 | 32,589 |
| January 2025 | 46,271 |
| December 2024 | 36,321 |
| November 2024 | 27,613 |
| October 2024 | 27,895 |
| September 2024 | 30,336 |
| August 2024 | 29,384 |
| July 2024 | 20,536 |
| June 2024 | 30,549 |
| May 2024 | 35,341 |
| April 2024 | 45,354 |
| March 2024 | 34,843 |
| February 2024 | 32,568 |
| January 2024 | 22,088 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Willow Creek Wind Power LLC plant, and when do they retire?
1 operable generator totals 105 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 105 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 105 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Willow Creek Wind Power LLC plant?
EIA lists no joint owners for Willow Creek Wind Power LLC. Willow Creek Wind Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Willow Creek Wind Power LLC plant?
Willow Creek Wind Power LLC is in Newell, Butte County, South Dakota, at 44.8259° N, 103.2074° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in South Dakota are similar in size?
South Dakota has 25 operable wind plants with 3,457 MW of capacity, and Willow Creek Wind Power LLC's 105 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Prairie Winds SD1 | Jerauld | 162 | 358,076 |
| Tatanka Ridge | Deuel | 154 | 593,774 |
| Dakota Range III Wind Project | Grant | 154 | 618,959 |
| Willow Creek Wind Power LLC | Butte | 105 | 374,200 |
| Day County Wind LLC | Day | 99 | 439,195 |
| Coyote Ridge | Brookings | 97 | 392,952 |
| Campbell County Wind Farm | Campbell | 94 | 342,906 |
Source: EIA Forms EIA-860 and EIA-923, 2025.