Skip to main content
RateWatt

Petroleum power plant, Florida

Winston petroleum power plant, Florida

Winston is a 50 MW petroleum power plant in Polk County, Florida, operated by City of Lakeland-(FL), and it generated 497 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 4th percentile of U.S. petroleum plants. By 2025 generation it ranks 12,117th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
under 1%Capacity factor, 2025, 4th percentile, on 50 MW net summer
12,117thU.S. rank by generation, 2025
24 yearsAverage generator age, by MW

How hard does the Winston plant run compared with other petroleum plants?

The Winston plant had a capacity factor of under 1% in 2025 on 50 MW of net summer capacity, the 4th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of petroleum plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Winstonunder 1%
Petroleum plants, 75th percentile1%
Petroleum plants, median1%
Petroleum plants, 25th percentile0%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Winston plant generating more or less than last year?

Generation at Winston rose 1174.4% from 2024 to 2025, from 39 MWh to 497 MWh.

Net generation by period
PeriodMWh
202439
2025497
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202535
November 202523
October 202526
September 202539
August 202517
July 202582
June 202536
May 202544
April 202522
March 202534
February 202515
January 2025123
December 20242
November 20241
October 20242
September 20242
August 20243
July 20242
June 20242
May 20244
April 202414
March 20242
February 20242
January 20243

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Winston plant?

Winston made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 234th largest of 331 plants in Florida, the 3,754th largest of 14,327 in the U.S. and the 102nd largest of 861 petroleum plants. By 2025 generation it is the 309th largest of 313 generating plants in the state.

Winston within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)5079,9360.1%
Generation (MWh)497267,867,7350.0%
Petroleum capacity (MW)508356.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Winston plant, and when do they retire?

20 operable generators total 50 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s2050100%none reported
Every generator, 20 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WD01OperatingPetroleum Liquids32001n/a
WD02OperatingPetroleum Liquids32001n/a
WD03OperatingPetroleum Liquids32001n/a
WD04OperatingPetroleum Liquids32001n/a
WD05OperatingPetroleum Liquids32001n/a
WD06OperatingPetroleum Liquids32001n/a
WD07OperatingPetroleum Liquids32001n/a
WD08OperatingPetroleum Liquids32001n/a
WD09OperatingPetroleum Liquids32001n/a
WD10OperatingPetroleum Liquids32001n/a
WD11OperatingPetroleum Liquids32001n/a
WD12OperatingPetroleum Liquids32001n/a
WD13OperatingPetroleum Liquids32001n/a
WD14OperatingPetroleum Liquids32001n/a
WD15OperatingPetroleum Liquids32001n/a
WD16OperatingPetroleum Liquids32001n/a
WD17OperatingPetroleum Liquids32001n/a
WD18OperatingPetroleum Liquids32001n/a
WD19OperatingPetroleum Liquids32001n/a
WD20OperatingPetroleum Liquids32001n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Winston plant?

EIA lists no joint owners for Winston. City of Lakeland-(FL) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Lakeland charge homes?

City of Lakeland, the operator of Winston, had an average residential price of 11.73¢ per kWh and an average bill of $136 a month in 2025, 23% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
City of Lakeland11.73¢$13623% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Winston plant?

Winston is in Lakeland, Polk County, Florida, at 28.0274° N, 82.0164° W. It sits in the Florida Municipal Power Pool balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which petroleum plants in Florida are similar in size?

Florida has 6 operable petroleum plants with 835 MW of capacity, and Winston's 50 MW is 6% of that.

Petroleum plants in Florida around this size
PlantCountyMW2025 MWh
WinstonPolk50497
Field StreetVolusia480

Source: EIA Forms EIA-860 and EIA-923, 2025.