Wind power plant, Kansas
Wpwp wind power plant, Kansas
Wpwp is a 307 MW wind power plant in Sumner County, Kansas, operated by Wild Plains Wind Project, LLC, and it generated 1,000,710 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.6% of the generation reported in Kansas, and its capacity factor sits at the 64th percentile of U.S. wind plants. By 2025 generation it ranks 735th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Wpwp plant run compared with other wind plants?
The Wpwp plant had a capacity factor of 37% in 2025 on 307 MW of net summer capacity, the 64th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 136 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Wpwp | 37% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Wpwp plant generating more or less than last year?
Wpwp generated 1,000,710 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 29.1% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 1,000,710 |
| 2026 through August | 830,722 |
| 2025, same months | 643,692 |
Monthly generation, Feb 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 95,237 |
| July 2026 | 75,265 |
| June 2026 | 104,144 |
| May 2026 | 104,772 |
| April 2026 | 125,537 |
| March 2026 | 131,190 |
| February 2026 | 87,357 |
| January 2026 | 107,220 |
| December 2025 | 113,332 |
| November 2025 | 90,994 |
| October 2025 | 95,964 |
| September 2025 | 56,728 |
| August 2025 | 66,164 |
| July 2025 | 84,125 |
| June 2025 | 82,174 |
| May 2025 | 71,160 |
| April 2025 | 117,926 |
| March 2025 | 129,278 |
| February 2025 | 92,865 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Wpwp plant, and when do they retire?
1 operable generator totals 307 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 307 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WPWP | Operating | Onshore Wind Turbine | 307 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Wpwp plant?
EIA lists no joint owners for Wpwp. Wild Plains Wind Project, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Wpwp plant?
Wpwp is in Wellington, Sumner County, Kansas, at 37.2839° N, 97.2151° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Kansas are similar in size?
Kansas has 52 operable wind plants with 9,714 MW of capacity, and Wpwp's 307 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Flat Ridge 2 Wind Energy LLC | Kingman | 470 | 1,020,654 |
| WPWP | Sumner | 307 | 1,000,710 |
| Neosho Ridge Wind Energy Center | Neosho | 301 | 1,109,763 |
| Irish Creek Wind | Marshall | 301 | 938,652 |
| Soldier Creek Wind | Nemaha | 300 | 1,017,263 |
Source: EIA Forms EIA-860 and EIA-923, 2025.