Skip to main content
RateWatt

Natural gas power plant, Montana

Yellowstone County Generating Station, Montana

Yellowstone County Generating Station is a 207 MW natural gas power plant in Yellowstone County, Montana, operated by NorthWestern Energy (MT wind/thermal), and it generated 383,412 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.4% of the generation reported in Montana, and its capacity factor sits at the 55th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,642nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

207 MWNameplate capacity
26%Capacity factor, 2025, 55th percentile, on 166 MW net summer
1.4%Of MT generation, 2025
1 yearAverage generator age, by MW

How hard does Yellowstone County Generating Station run compared with other natural gas plants?

Yellowstone County Generating Station had a capacity factor of 26% in 2025 on 166 MW of net summer capacity, the 55th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 96 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Yellowstone County Generating Station26%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Yellowstone County Generating Station generating more or less than last year?

Yellowstone County Generating Station generated 383,412 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 47.6% ahead of the same months of 2025. 2024 has output for only 5 months, so the two years are not compared.

Net generation by period
PeriodMWh
202483,378
2025383,412
2026 through August312,931
2025, same months211,989
Monthly generation, Jul 2024 to Aug 2026
MonthMWh
August 202684,726
July 202666,097
June 202615,253
May 202626,239
April 202623,350
March 202624,448
February 202644,299
January 202628,519
December 202530,000
November 202560,120
October 202560,251
September 202521,052
August 202533,241
July 202522,790
June 202525,787
May 202520,531
April 202516,677
March 202527,438
February 202532,564
January 202532,961
December 202429,207
November 202422,658
October 202411,806
September 20241,627
August 20240
July 202418,080

Source: EIA Form EIA-923, through August 2026.

How much of Montana's electricity comes from Yellowstone County Generating Station?

Yellowstone County Generating Station made 1.4% of the 26,725,203 MWh reported by Montana plants in 2025, from 2.7% of the state's 7,662 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 11th largest of 73 plants in Montana, the 1,453rd largest of 14,327 in the U.S. and the 705th largest of 1,962 natural gas plants. By 2025 generation it is the 17th largest of 71 generating plants in the state.

Yellowstone County Generating Station within Montana, 2025
MeasureThis plantMontanaShare
Capacity (MW)2077,6622.7%
Generation (MWh)383,41226,725,2031.4%
Natural gas capacity (MW)20770529.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Yellowstone County Generating Station, and when do they retire?

18 operable generators total 207 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s18207100%none reported
Every generator, 18 in all
UnitStatusTechnologyMWIn servicePlanned retirement
YGS01OperatingNatural Gas Internal Combustion Engine122024n/a
YGS02OperatingNatural Gas Internal Combustion Engine122024n/a
YGS03OperatingNatural Gas Internal Combustion Engine122024n/a
YGS04OperatingNatural Gas Internal Combustion Engine122024n/a
YGS05OperatingNatural Gas Internal Combustion Engine122024n/a
YGS06OperatingNatural Gas Internal Combustion Engine122024n/a
YGS07OperatingNatural Gas Internal Combustion Engine122024n/a
YGS08OperatingNatural Gas Internal Combustion Engine122024n/a
YGS09OperatingNatural Gas Internal Combustion Engine122024n/a
YGS10OperatingNatural Gas Internal Combustion Engine122024n/a
YGS11OperatingNatural Gas Internal Combustion Engine122024n/a
YGS12OperatingNatural Gas Internal Combustion Engine122024n/a
YGS13OperatingNatural Gas Internal Combustion Engine122024n/a
YGS14OperatingNatural Gas Internal Combustion Engine122024n/a
YGS15OperatingNatural Gas Internal Combustion Engine122024n/a
YGS16OperatingNatural Gas Internal Combustion Engine122024n/a
YGS17OperatingNatural Gas Internal Combustion Engine122024n/a
YGS18OperatingNatural Gas Internal Combustion Engine122024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Yellowstone County Generating Station?

EIA lists no joint owners for Yellowstone County Generating Station. NorthWestern Energy (MT wind/thermal) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Yellowstone County Generating Station?

Yellowstone County Generating Station is in Laurel, Yellowstone County, Montana, at 45.6599° N, 108.7608° W. It sits in the NorthWestern Energy (NWMT) balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Montana are similar in size?

Montana has 8 operable natural gas plants with 705 MW of capacity, and Yellowstone County Generating Station's 207 MW is 29% of that.

Natural gas plants in Montana around this size
PlantCountyMW2025 MWh
Yellowstone County Generating StationYellowstone207383,412
Dave Gates Generating StationDeer Lodge203502,641
Culbertson Generation StationRoosevelt108231,170

Source: EIA Forms EIA-860 and EIA-923, 2025.