Natural gas power plant, Michigan

Zeeland natural gas power plant, Michigan

Zeeland is a 22.3 MW natural gas power plant in Ottawa County, Michigan, operated by City of Zeeland-(MI), and it generated 600 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 3rd percentile of U.S. natural gas plants. By 2025 generation it ranks 12,058th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

22.3 MWNameplate capacity
under 1%Capacity factor, 2025, 3rd percentile, on 22.2 MW net summer
12,058thU.S. rank by generation, 2025
53 yearsAverage generator age, by MW

How hard does the Zeeland plant run compared with other natural gas plants?

The Zeeland plant had a capacity factor of under 1% in 2025 on 22.2 MW of net summer capacity, the 3rd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Zeelandunder 1%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Zeeland plant generating more or less than last year?

Generation at Zeeland fell 502.7% from 2024 to 2025, from -149 MWh to 600 MWh.

12 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
2024-149
2025600
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202559
November 202553
October 202548
September 202560
August 202559
July 202560
June 202549
May 202537
April 202540
March 202540
February 202544
January 202553
December 2024-11
November 2024-12
October 2024-10
September 2024-13
August 2024-15
July 2024-15
June 2024-12
May 2024-14
April 2024-12
March 2024-13
February 2024-12
January 2024-11

Source: EIA Form EIA-923, through August 2026.

How much of Michigan's electricity comes from the Zeeland plant?

Zeeland made 0.0% of the 127,929,498 MWh reported by Michigan plants in 2025, from 0.1% of the state's 34,725 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 283 plants in Michigan, the 4,685th largest of 14,327 in the U.S. and the 1,269th largest of 1,962 natural gas plants. By 2025 generation it is the 245th largest of 261 generating plants in the state.

Zeeland within Michigan, 2025
MeasureThis plantMichiganShare
Capacity (MW)2234,7250.1%
Generation (MWh)600127,929,4980.0%
Natural gas capacity (MW)2214,3970.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Zeeland plant, and when do they retire?

7 operable generators total 22.3 MW, with an average age of 53 years weighted by capacity at the end of 2025. 22.3 MW, 100% of operable capacity, has a planned retirement, the first in 2032.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s129%2032
1960s3419%2032, 2040
1970s21045%2045
1980s1627%2045
Capacity retiring by year
YearUnitsMW retiringShare of plant
20322417%
20402311%
204531672%
Every generator, 7 in all
UnitStatusTechnologyMWIn servicePlanned retirement
7OperatingNatural Gas Internal Combustion Engine219572032
8OperatingNatural Gas Internal Combustion Engine219632032
1OperatingNatural Gas Internal Combustion Engine119662040
2OperatingNatural Gas Internal Combustion Engine119672040
9OperatingNatural Gas Internal Combustion Engine519712045
10OperatingNatural Gas Internal Combustion Engine619742045
11OperatingNatural Gas Internal Combustion Engine619802045

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Zeeland plant?

EIA lists no joint owners for Zeeland. City of Zeeland-(MI) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Zeeland charge homes?

City of Zeeland, the operator of Zeeland, had an average residential price of 9.98¢ per kWh and an average bill of $69 a month in 2025, 50% below the Michigan average of 20.03¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Michigan
City of Zeeland9.98¢$6950% lower
Michigan average20.03¢$127
U.S. average17.23¢$15114% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Zeeland plant?

Zeeland is in Zeeland, Ottawa County, Michigan, at 42.8067° N, 86.0558° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Michigan are similar in size?

Michigan has 60 operable natural gas plants with 14,397 MW of capacity, and Zeeland's 22.3 MW is 0% of that.

Natural gas plants in Michigan around this size
PlantCountyMW2025 MWh
Ada Cogeneration LPKent33184,857
Claude VandykeAllegan258,353
VestaburgMontcalm244,397
ZeelandOttawa22535
Otsego Mill Power PlantAllegan21162,536
PCA, Filer City MillManistee2089,742
St ClairSt Clair194,561

Source: EIA Forms EIA-860 and EIA-923, 2025.