Washington electricity by city
Electric company in Lake Stickney, WA: $92 median bill
PUD No 1 of Snohomish County is the electric company listed for ZIP codes in Lake Stickney (NREL and OpenEI, 2024), and households report a median bill of about $92 a month (Census ACS 2020-2024, estimated from reported brackets). The median bill in Lake Stickney is 23% below the Snohomish County median of $119.
Latest data: EIA 2025, Census 2020-2024; data loaded .
Who sells electricity in Lake Stickney?
One utility, PUD No 1 of Snohomish County, appears in the ZIP codes that overlap Lake Stickney, at an average residential price of 12.08¢ in 2025.
| Utility | Type | Average price | Year and source | Residential customers | Share of city land |
|---|---|---|---|---|---|
| PUD No 1 of Snohomish County | Public power, full service | 12.08¢ | 2025, EIA-861 | 349,905 | 100% |
EIA's service-territory list for Snohomish County also names Bonneville Power Administration. These sell somewhere in the county; EIA does not say which neighborhoods.
Source: NREL and OpenEI, U.S. Electric Utility Companies and Rates, ZIP lookup, 2024 file. Average prices: EIA Form EIA-861, Sales to Ultimate Customers, 2025 unless the row names another year.
What do households in Lake Stickney report paying for electricity?
The median household that pays its own electric bill in Lake Stickney reports about $92 a month, 33% below the Washington median and 41% below the U.S. median. 5,846 households reported a bill, and 5% of households pay no separate electric bill.
Share of households by reported monthly electric bill, 2020-2024
Across Washington, the Census median runs 31% above EIA's average bill for the same years, and the two measure different things. Why they differ.
The median is estimated by interpolating inside the Census dollar brackets, so it is an estimate rather than a published figure. The bill figures cover 2020-2024; the utility prices above are for the year shown in each row.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year. U.S. row: the 51 state rows summed and re-interpolated.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
How many homes in Lake Stickney heat with electricity?
58% of Lake Stickney homes heat with electricity, about the same as the Washington share and 17 points above the U.S. share. Gas heats 40% of homes.
| Area | Electricity | Gas | Other |
|---|---|---|---|
| Lake Stickney | 58% | 40% | 2% |
| Washington | 59% | 36% | 5% |
| U.S. | 41% | 51% | 7% |
Source: U.S. Census Bureau, American Community Survey table B25040, 2020-2024 5-year.
How big is the electric bill against income in Lake Stickney?
A year of the median bill comes to about $1,100, or roughly 1.2% of Lake Stickney's median household income of $94,020, against 1.7% across Washington. This is an estimate: it divides twelve times a bracket-based median by a separate median, and both cover 2020-2024.
Source: U.S. Census Bureau, American Community Survey tables B25132 and B19013, 2020-2024 5-year.
What does it cost to run common appliances in Lake Stickney?
A space heater at the usage below runs about $43.50 a month at PUD No 1 of Snohomish County's average price of 12.08¢.
| Appliance | kWh a month | PUD No 1 of Snohomish County 12.08¢, 2025 |
|---|---|---|
| Space heater | 360 | $43.50 |
| Central air conditioner | 193 | $23.35 |
| Electric water heater | 226 | $27.25 |
| Refrigerator | 51 | $6.21 |
| Clothes dryer | 57 | $6.85 |
| Television | 14 | $1.69 |
Source: Appliance wattage and hours on each appliance's page; prices as in the utility table above.
Which other cities are in Snohomish County?
Snohomish County also includes Everett, Marysville, and Edmonds; Everett reports $105 a month against $92 here.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
What power plants are in Snohomish County?
4 power plants with 125 MW of capacity are in Snohomish County, the largest being H M Jackson at 112 MW.
| Plant | Fuel | Capacity (MW) |
|---|---|---|
| H M Jackson | Hydro | 112 |
| Youngs Creek Hydroelectric Project | Hydro | 8 |
| Darrington | Biomass | 5 |
| Arlington Microgrid | Battery and pumped storage | 2 |
Source: EIA Form EIA-860, 2025.