Solar power plant, California

Adobe Solar power plant, California

Adobe Solar is a 20 MW solar power plant in KERN County, California, operated by Southern Power Co, and it generated 36,429 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 31st percentile of U.S. solar plants. By 2025 generation it ranks 4,487th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
21%Capacity factor, 2025, 31st percentile, on 20 MW net summer
4,487thU.S. rank by generation, 2025
11 yearsAverage generator age, by MW

How hard does the Adobe Solar plant run compared with other solar plants?

The Adobe Solar plant had a capacity factor of 21% in 2025 on 20 MW of net summer capacity, the 31st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 76 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Adobe Solar21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Adobe Solar plant generating more or less than last year?

Generation at Adobe Solar fell 8.1% from 2024 to 2025, from 39,619 MWh to 36,429 MWh.

Net generation by period
PeriodMWh
202439,619
202536,429
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025965
November 20252,036
October 20253,363
September 20252,833
August 20252,394
July 20254,414
June 20254,865
May 20255,500
April 20251,111
March 20253,794
February 20252,631
January 20252,523
December 20241,564
November 20241,488
October 20242,518
September 20243,680
August 20244,605
July 20244,712
June 20244,996
May 20244,661
April 20244,510
March 20242,558
February 20242,476
January 20241,851

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Adobe Solar plant?

Adobe Solar made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,086th largest of 7,223 solar plants. By 2025 generation it is the 547th largest of 1,608 generating plants in the state.

Adobe Solar within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)36,429204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Adobe Solar plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
FRV3OperatingSolar Photovoltaic202014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Adobe Solar plant?

Adobe Solar LLC is the only joint owner reported for Adobe Solar, with 100.0%. Southern Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Adobe Solar plant?

Adobe Solar is in Arvin, KERN County, California, at 35.1028° N, 118.9544° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Adobe Solar's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Stroud Solar StationFresno2014,874
Cantua Solar StationFresno2023,012
Huron Solar StationFresno2028,084
Adobe SolarKERN2036,429
Guernsey Solar StationKings2021,527
Gates Solar StationFresno2030,509
Alpaugh NorthTulare2021,051

Source: EIA Forms EIA-860 and EIA-923, 2025.