Skip to main content
RateWatt

Solar power plant, California

Stroud Solar Station, California

Stroud Solar Station is a 20 MW solar power plant in Fresno County, California, operated by Pacific Gas & Electric Co., and it generated 14,874 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 6th percentile of U.S. solar plants. By 2025 generation it ranks 5,574th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
8%Capacity factor, 2025, 6th percentile, on 20 MW net summer
5,574thU.S. rank by generation, 2025
14 yearsAverage generator age, by MW

How hard does Stroud Solar Station run compared with other solar plants?

Stroud Solar Station had a capacity factor of 8% in 2025 on 20 MW of net summer capacity, the 6th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 31 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Stroud Solar Station8%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Stroud Solar Station generating more or less than last year?

Stroud Solar Station generated 14,874 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
202421,268
202514,874
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025309
November 20251,423
October 20251,448
September 20251,377
August 20252,039
July 20251,588
June 20251,823
May 20252,534
April 20251,099
March 20251,234
February 20250
January 20250
December 20240
November 20240
October 2024989
September 20242,610
August 20243,667
July 20243,577
June 20242,291
May 20242,161
April 20241,372
March 20241,485
February 20241,617
January 20241,499

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from Stroud Solar Station?

Stroud Solar Station made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,083rd largest of 7,223 solar plants. By 2025 generation it is the 732nd largest of 1,608 generating plants in the state.

Stroud Solar Station within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)14,874204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Stroud Solar Station, and when do they retire?

1 operable generator totals 20 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic202011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Stroud Solar Station?

EIA lists no joint owners for Stroud Solar Station. Pacific Gas & Electric Co. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Pacific Gas & Electric Co. charge homes?

Pacific Gas & Electric Co., the operator of Stroud Solar Station, had an average residential price of 37.52¢ per kWh and an average bill of $174 a month in 2025, 20% above the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Pacific Gas & Electric Co.37.52¢$17420% higher
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Stroud Solar Station?

Stroud Solar Station is in Helm, Fresno County, California, at 36.5314° N, 120.1069° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Stroud Solar Station's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
RE Garland AKern2056,742
Sunray 2San Bernardino2054,600
Sun City Project LLCKings2033,418
Stroud Solar StationFresno2014,874
Cantua Solar StationFresno2023,012
Huron Solar StationFresno2028,084
Adobe SolarKERN2036,429

Source: EIA Forms EIA-860 and EIA-923, 2025.