Alta Farms II Wind Project, LLC power plant, Illinois

Alta Farms II Wind Project, LLC is a 201 MW wind power plant in DeWitt County, Illinois, operated by Alta Farms II Wind Project, LLC, and it generated 545,768 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Illinois, and its capacity factor sits at the 44th percentile of U.S. wind plants. By 2025 generation it ranks 1,254th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

201 MWNameplate capacity
31%Capacity factor, 2025, 44th percentile, on 201 MW net summer
0.3%Of IL generation, 2025
2 yearsAverage generator age, by MW

How hard does the Alta Farms II Wind Project, LLC plant run compared with other wind plants?

The Alta Farms II Wind Project, LLC plant had a capacity factor of 31% in 2025 on 201 MW of net summer capacity, the 44th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 113 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Alta Farms II Wind Project, LLC31%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Alta Farms II Wind Project, LLC plant generating more or less than last year?

Generation at Alta Farms II Wind Project, LLC fell 6.2% from 2024 to 2025, from 581,737 MWh to 545,768 MWh. Through August 2026 it is running 17.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024581,737
2025545,768
2026 through August413,094
2025, same months352,072
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202626,559
July 202620,229
June 202640,037
May 202648,978
April 202682,675
March 202672,142
February 202653,081
January 202669,393
December 202564,500
November 202561,790
October 202552,905
September 202514,501
August 202521,839
July 202515,845
June 202526,335
May 202538,849
April 202547,891
March 202569,674
February 202561,101
January 202570,538
December 202468,330
November 202466,148
October 202450,266
September 202424,323
August 202423,810
July 202417,176
June 202438,145
May 202440,219
April 202472,383
March 202469,335
February 202462,030
January 202449,572

Source: EIA Form EIA-923, through August 2026.

How much of Illinois' electricity comes from the Alta Farms II Wind Project, LLC plant?

Alta Farms II Wind Project, LLC made 0.3% of the 191,710,915 MWh reported by Illinois plants in 2025, from 0.4% of the state's 52,515 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 64th largest of 602 plants in Illinois, the 1,512th largest of 14,327 in the U.S. and the 265th largest of 1,358 wind plants. By 2025 generation it is the 44th largest of 531 generating plants in the state.

Alta Farms II Wind Project, LLC within Illinois, 2025
MeasureThis plantIllinoisShare
Capacity (MW)20152,5150.4%
Generation (MWh)545,768191,710,9150.3%
Wind capacity (MW)2018,4582.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Alta Farms II Wind Project, LLC plant, and when do they retire?

1 operable generator totals 201 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1201100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WT2OperatingOnshore Wind Turbine2012023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Alta Farms II Wind Project, LLC plant?

EIA lists no joint owners for Alta Farms II Wind Project, LLC. Alta Farms II Wind Project, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Alta Farms II Wind Project, LLC plant?

Alta Farms II Wind Project, LLC is in Clinton, DeWitt County, Illinois, at 40.1972° N, 89.0677° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Illinois are similar in size?

Illinois has 55 operable wind plants with 8,458 MW of capacity, and Alta Farms II Wind Project, LLC's 201 MW is 2% of that.

Wind plants in Illinois around this size
PlantCountyMW2025 MWh
Top Hat WindLogan20473,628
Sugar Creek Wind One LLCLogan202581,921
Harvest Ridge Wind FarmDouglas202667,048
Alta Farms II Wind Project, LLCDeWitt201545,768
Blackstone Wind Farm II LLCLivingston200481,538
Minonk Wind FarmWoodford200622,918
Bishop Hill Energy LLCHenry200713,325

Source: EIA Forms EIA-860 and EIA-923, 2025.