Altavista Power Station is a 71.1 MW biomass power plant in Campbell County, Virginia, operated by Virginia Electric & Power Co, and it generated 299,825 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Virginia, and its capacity factor sits at the 78th percentile of U.S. biomass plants. By 2025 generation it ranks 1,972nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Altavista Power Station run compared with other biomass plants?
Altavista Power Station had a capacity factor of 67% in 2025 on 51 MW of net summer capacity, the 78th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 245 days at full output out of 365.
0%Shaded: the middle half of biomass plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Altavista Power Station | 67% |
| Biomass plants, 75th percentile | 65% |
| Biomass plants, median | 48% |
| Biomass plants, 25th percentile | 35% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Altavista Power Station generating more or less than last year?
Altavista Power Station generated 299,825 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 11 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 268,686 |
| 2025 | 299,825 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 33,810 |
| November 2025 | 28,125 |
| October 2025 | 18,952 |
| September 2025 | 5,565 |
| August 2025 | 36,679 |
| July 2025 | 32,357 |
| June 2025 | 24,860 |
| May 2025 | 28,331 |
| April 2025 | 18,205 |
| March 2025 | 6,508 |
| February 2025 | 32,325 |
| January 2025 | 34,108 |
| December 2024 | 36,317 |
| November 2024 | 3,546 |
| October 2024 | 0 |
| September 2024 | 7,168 |
| August 2024 | 33,498 |
| July 2024 | 26,430 |
| June 2024 | 35,924 |
| May 2024 | 33,648 |
| April 2024 | 22,330 |
| March 2024 | 4,506 |
| February 2024 | 30,415 |
| January 2024 | 34,904 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Altavista Power Station, and when do they retire?
1 operable generator totals 71.1 MW, with an average age of 33 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 1 | 71 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Wood/Wood Waste Biomass | 71 | 1992 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Altavista Power Station?
EIA lists no joint owners for Altavista Power Station. Virginia Electric & Power Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Virginia Electric & Power Co charge homes?
Virginia Electric & Power Co, the operator of Altavista Power Station, had an average residential price of 15.20¢ per kWh and an average bill of $158 a month in 2025, 1% below the Virginia average of 15.28¢.
| Measure | Price | Monthly bill | Against Virginia |
|---|---|---|---|
| Virginia Electric & Power Co | 15.20¢ | $158 | 1% lower |
| Virginia average | 15.28¢ | $163 | |
| U.S. average | 17.23¢ | $151 | 13% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is Altavista Power Station?
Altavista Power Station is in Altavista, Campbell County, Virginia, at 37.1187° N, 79.2736° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which biomass plants in Virginia are similar in size?
Virginia has 24 operable biomass plants with 816 MW of capacity, and Altavista Power Station's 71.1 MW is 9% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Covington Facility | Alleghany | 116 | 458,485 |
| WestRock-West Point Mill | King William | 101 | 334,529 |
| Hopewell Power Station | Hopewell City | 71 | 315,998 |
| Altavista Power Station | Campbell | 71 | 299,745 |
| Southampton Power Station | Southampton | 71 | 251,740 |
| Halifax County Biomass | Halifax | 50 | 358,696 |
| Hopewell Mill | Hopewell City | 48 | 220,745 |
Source: EIA Forms EIA-860 and EIA-923, 2025.