Skip to main content
RateWatt

Biomass power plant, Virginia

Covington Facility, Virginia

Covington Facility is a 161 MW power plant, 116 MW of it biomass, in Alleghany County, Virginia, operated by WestRock Corp, and it generated 725,118 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Virginia, and its capacity factor sits at the 46th percentile of U.S. biomass plants. By 2025 generation it ranks 960th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

161 MWNameplate capacity
46%Capacity factor, 2025, biomass units, 46th percentile, on 114 MW net summer
0.7%Of VA generation, 2025
28 yearsAverage generator age, by MW

How hard does the Covington Facility plant run compared with other biomass plants?

The Covington Facility plant's biomass units had a capacity factor of 46% in 2025 on 114 MW of net summer capacity, the 46th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 168 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Covington Facility46%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its biomass generators only. Values above 105% are left out of the comparison.

Is the Covington Facility plant generating more or less than last year?

Generation at Covington Facility fell 2.2% from 2024 to 2025, from 741,222 MWh to 725,118 MWh. Through August 2026 it is running 11.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024741,222
2025725,118
2026 through August529,202
2025, same months473,769
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202660,660
July 202665,389
June 202658,009
May 202665,947
April 202666,428
March 202668,882
February 202667,464
January 202676,423
December 202574,299
November 202571,134
October 202550,345
September 202555,571
August 202560,954
July 202561,034
June 202564,246
May 202566,232
April 202528,704
March 202568,571
February 202562,463
January 202561,565
December 202475,577
November 202473,577
October 202448,482
September 202464,225
August 202465,242
July 202458,045
June 202461,240
May 202455,256
April 202445,288
March 202469,613
February 202466,670
January 202458,007

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Covington Facility plant?

Covington Facility made 0.7% of the 106,220,859 MWh reported by Virginia plants in 2025, from 0.5% of the state's 31,312 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 32nd largest of 259 plants in Virginia, the 1,897th largest of 14,327 in the U.S. and the 6th largest of 585 biomass plants on its biomass units alone. By 2025 generation it is the 18th largest of 241 generating plants in the state.

Covington Facility within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)16131,3120.5%
Generation (MWh)725,118106,220,8590.7%
Biomass capacity (MW)11681614.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Covington Facility plant, and when do they retire?

4 operable generators total 161 MW, with an average age of 28 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 3 have already retired, totalling 26.5 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s1117%none reported
1980s26842%none reported
2010s18251%none reported
Every generator, 7 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN3OperatingConventional Steam Coal111951n/a
GEN4OperatingWood/Wood Waste Biomass341980n/a
GEN5OperatingConventional Steam Coal341989n/a
GEN7OperatingWood/Wood Waste Biomass822013n/a
GEN6RetiredWood/Wood Waste Biomass619302009
GEN1RetiredConventional Steam Coal1119392013
GEN2RetiredConventional Steam Coal1119462013

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Covington Facility plant?

EIA lists no joint owners for Covington Facility. WestRock Corp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Covington Facility plant use?

Covington Facility has capacity on 2 fuels: 72% biomass and 28% coal. In 2025, biomass made 63% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Biomass11672.3%458,485
Coal4527.7%83,853

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Covington Facility plant?

Covington Facility is in Covington, Alleghany County, Virginia, at 37.7997° N, 79.9947° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Virginia are similar in size?

Virginia has 24 operable biomass plants with 816 MW of capacity, and Covington Facility's 116 MW is 14% of that.

Biomass plants in Virginia around this size
PlantCountyMW2025 MWh
Covanta Fairfax EnergyFairfax124315,838
Covington FacilityAlleghany116458,485
WestRock-West Point MillKing William101334,529
Hopewell Power StationHopewell City71315,998
Altavista Power StationCampbell71299,745

Source: EIA Forms EIA-860 and EIA-923, 2025.