Solar power plant, Missouri
Altona Solar, LLC power plant, Missouri
Altona Solar, LLC is a 30 MW solar power plant in Audrain County, Missouri, operated by Birch Creek Power, LLC, and it generated 64,794 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Missouri, and its capacity factor sits at the 62nd percentile of U.S. solar plants. By 2025 generation it ranks 3,820th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Altona Solar, LLC plant run compared with other solar plants?
The Altona Solar, LLC plant had a capacity factor of 25% in 2025 on 30 MW of net summer capacity, the 62nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Altona Solar, LLC | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Altona Solar, LLC plant generating more or less than last year?
Altona Solar, LLC generated 64,794 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.4% ahead of the same months of 2025. 2024 has output for only 5 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 26,100 |
| 2025 | 64,794 |
| 2026 through August | 51,668 |
| 2025, same months | 49,002 |
Monthly generation, Jun 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 6,819 |
| July 2026 | 8,396 |
| June 2026 | 7,444 |
| May 2026 | 7,621 |
| April 2026 | 6,440 |
| March 2026 | 5,852 |
| February 2026 | 5,025 |
| January 2026 | 4,071 |
| December 2025 | 2,556 |
| November 2025 | 3,464 |
| October 2025 | 4,442 |
| September 2025 | 5,330 |
| August 2025 | 6,530 |
| July 2025 | 7,800 |
| June 2025 | 7,000 |
| May 2025 | 7,639 |
| April 2025 | 4,935 |
| March 2025 | 6,576 |
| February 2025 | 4,131 |
| January 2025 | 4,391 |
| December 2024 | 2,659 |
| November 2024 | 3,014 |
| October 2024 | 6,720 |
| September 2024 | 6,127 |
| August 2024 | 7,580 |
| July 2024 | 0 |
| June 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Altona Solar, LLC plant, and when do they retire?
1 operable generator totals 30 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 30 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV | Operating | Solar Photovoltaic | 30 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Altona Solar, LLC plant?
EIA lists no joint owners for Altona Solar, LLC. Birch Creek Power, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Altona Solar, LLC plant?
Altona Solar, LLC is in Centralia, Audrain County, Missouri, at 39.2835° N, 92.1420° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Missouri are similar in size?
Missouri has 35 operable solar plants with 1,422 MW of capacity, and Altona Solar, LLC's 30 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Envoy Solar, LLC | Audrain | 50 | 94,940 |
| Vandalia Renewable Energy Center | Audrain | 50 | 2,239 |
| Bowling Green Renewable Energy Center | Pike | 50 | n/a |
| Altona Solar, LLC | Audrain | 30 | 64,794 |
Source: EIA Forms EIA-860 and EIA-923, 2025.