Solar power plant, Missouri
Envoy Solar, LLC power plant, Missouri
Envoy Solar, LLC is a 50 MW solar power plant in Audrain County, Missouri, operated by Birch Creek Power, LLC, and it generated 94,940 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Missouri, and its capacity factor sits at the 39th percentile of U.S. solar plants. By 2025 generation it ranks 3,453rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Envoy Solar, LLC plant run compared with other solar plants?
The Envoy Solar, LLC plant had a capacity factor of 22% in 2025 on 50 MW of net summer capacity, the 39th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 79 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Envoy Solar, LLC | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Envoy Solar, LLC plant generating more or less than last year?
Envoy Solar, LLC generated 94,940 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 20.1% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 94,940 |
| 2026 through August | 80,975 |
| 2025, same months | 67,429 |
Monthly generation, Feb 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 10,338 |
| July 2026 | 12,654 |
| June 2026 | 12,206 |
| May 2026 | 12,204 |
| April 2026 | 10,798 |
| March 2026 | 9,360 |
| February 2026 | 7,972 |
| January 2026 | 5,443 |
| December 2025 | 3,730 |
| November 2025 | 5,432 |
| October 2025 | 7,565 |
| September 2025 | 10,784 |
| August 2025 | 11,901 |
| July 2025 | 12,043 |
| June 2025 | 11,698 |
| May 2025 | 12,490 |
| April 2025 | 8,956 |
| March 2025 | 9,914 |
| February 2025 | 427 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Envoy Solar, LLC plant, and when do they retire?
1 operable generator totals 50 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 50 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV | Operating | Solar Photovoltaic | 50 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Envoy Solar, LLC plant?
EIA lists no joint owners for Envoy Solar, LLC. Birch Creek Power, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Envoy Solar, LLC plant?
Envoy Solar, LLC is in Mexico, Audrain County, Missouri, at 39.1567° N, 91.8480° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Missouri are similar in size?
Missouri has 35 operable solar plants with 1,422 MW of capacity, and Envoy Solar, LLC's 50 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Envoy Solar, LLC | Audrain | 50 | 94,940 |
| Vandalia Renewable Energy Center | Audrain | 50 | 2,239 |
| Bowling Green Renewable Energy Center | Pike | 50 | n/a |
| Altona Solar, LLC | Audrain | 30 | 64,794 |
Source: EIA Forms EIA-860 and EIA-923, 2025.