ANP Blackstone Energy Project is a 578 MW natural gas power plant in Worcester County, Massachusetts, operated by ANP Blackstone Energy Company LLC, and it generated 3,254,404 MWh in 2025 (Forms EIA-860 and EIA-923). That is 14.6% of the generation reported in Massachusetts, and its capacity factor sits at the 91st percentile of U.S. natural gas plants. By 2025 generation it ranks 367th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

578 MWNameplate capacity
77%Capacity factor, 2025, 91st percentile, on 482 MW net summer
14.6%Of MA generation, 2025
24 yearsAverage generator age, by MW

How hard does the ANP Blackstone Energy Project plant run compared with other natural gas plants?

The ANP Blackstone Energy Project plant had a capacity factor of 77% in 2025 on 482 MW of net summer capacity, the 91st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 282 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
ANP Blackstone Energy Project77%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the ANP Blackstone Energy Project plant generating more or less than last year?

Generation at ANP Blackstone Energy Project rose 63.5% from 2024 to 2025, from 1,991,001 MWh to 3,254,404 MWh. Through August 2026 it is running 34.3% behind the same months of 2025.

Net generation by period
PeriodMWh
20241,991,001
20253,254,404
2026 through August1,399,153
2025, same months2,129,646
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026168,363
July 2026174,387
June 202692,591
May 202647,748
April 2026179,804
March 2026200,661
February 2026244,660
January 2026290,939
December 2025305,895
November 2025302,814
October 2025255,096
September 2025260,953
August 2025277,719
July 2025298,578
June 2025271,845
May 2025261,269
April 2025278,154
March 2025228,408
February 2025234,971
January 2025278,702
December 2024262,921
November 2024154,795
October 2024148,361
September 202497,661
August 2024138,179
July 2024259,193
June 202488,401
May 202450,504
April 2024183,228
March 2024132,764
February 2024191,154
January 2024283,840

Source: EIA Form EIA-923, through August 2026.

How much of Massachusetts' electricity comes from the ANP Blackstone Energy Project plant?

ANP Blackstone Energy Project made 14.6% of the 22,344,120 MWh reported by Massachusetts plants in 2025, from 4.4% of the state's 12,992 MW of capacity. Its share of output is 3.3 times its share of capacity. By capacity it is the 6th largest of 686 plants in Massachusetts, the 638th largest of 14,327 in the U.S. and the 394th largest of 1,962 natural gas plants. By 2025 generation it is the 2nd largest of 647 generating plants in the state.

ANP Blackstone Energy Project within Massachusetts, 2025
MeasureThis plantMassachusettsShare
Capacity (MW)57812,9924.4%
Generation (MWh)3,254,40422,344,12014.6%
Natural gas capacity (MW)5785,9789.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the ANP Blackstone Energy Project plant, and when do they retire?

2 operable generators total 578 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s2578100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
U1OperatingNatural Gas Fired Combined Cycle2892001n/a
U2OperatingNatural Gas Fired Combined Cycle2892001n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the ANP Blackstone Energy Project plant?

EIA lists no joint owners for ANP Blackstone Energy Project. ANP Blackstone Energy Company LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the ANP Blackstone Energy Project plant?

ANP Blackstone Energy Project is in Blackstone, Worcester County, Massachusetts, at 42.0599° N, 71.5158° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Massachusetts are similar in size?

Massachusetts has 40 operable natural gas plants with 5,978 MW of capacity, and ANP Blackstone Energy Project's 578 MW is 10% of that.

Natural gas plants in Massachusetts around this size
PlantCountyMW2025 MWh
Fore River Generating StationNorfolk8722,991,131
Salem Harbor Power Development LPEssex7981,793,994
ANP Bellingham Energy ProjectNorfolk5783,509,349
ANP Blackstone Energy ProjectWorcester5783,254,404
Millennium PowerWorcester428852,182
Bellingham Cogeneration FacilityNorfolk386304,572
Berkshire PowerHampden289809,512

Source: EIA Forms EIA-860 and EIA-923, 2025.