Solar power plant, Montana
Apex Solar power plant, Montana
Apex Solar is a 80 MW solar power plant in Beaverhead County, Montana, operated by Apex Solar LLC, and it generated 164,724 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Montana, and its capacity factor sits at the 53rd percentile of U.S. solar plants. By 2025 generation it ranks 2,765th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Apex Solar plant run compared with other solar plants?
The Apex Solar plant had a capacity factor of 24% in 2025 on 80 MW of net summer capacity, the 53rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 86 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Apex Solar | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Apex Solar plant generating more or less than last year?
Generation at Apex Solar rose 5.1% from 2024 to 2025, from 156,658 MWh to 164,724 MWh. Through August 2026 it is running 12.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 156,658 |
| 2025 | 164,724 |
| 2026 through August | 109,723 |
| 2025, same months | 125,047 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 20,000 |
| July 2026 | 21,986 |
| June 2026 | 19,283 |
| May 2026 | 15,839 |
| April 2026 | 9,004 |
| March 2026 | 8,159 |
| February 2026 | 8,687 |
| January 2026 | 6,765 |
| December 2025 | 4,419 |
| November 2025 | 7,225 |
| October 2025 | 10,852 |
| September 2025 | 17,181 |
| August 2025 | 20,194 |
| July 2025 | 22,121 |
| June 2025 | 21,483 |
| May 2025 | 18,709 |
| April 2025 | 14,461 |
| March 2025 | 11,789 |
| February 2025 | 9,050 |
| January 2025 | 7,240 |
| December 2024 | 5,457 |
| November 2024 | 7,252 |
| October 2024 | 11,288 |
| September 2024 | 16,839 |
| August 2024 | 19,860 |
| July 2024 | 23,331 |
| June 2024 | 20,570 |
| May 2024 | 14,169 |
| April 2024 | 12,695 |
| March 2024 | 12,280 |
| February 2024 | 8,374 |
| January 2024 | 4,543 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Apex Solar plant, and when do they retire?
1 operable generator totals 80 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 80 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RSNAK | Operating | Solar Photovoltaic | 80 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Apex Solar plant?
CRE-Apex Montana LLC is the only joint owner reported for Apex Solar, with 100.0%. Apex Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Apex Solar plant?
Apex Solar is in Dillon, Beaverhead County, Montana, at 45.2360° N, 112.7460° W. It sits in the NorthWestern Energy (NWMT) balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Montana are similar in size?
Montana has 9 operable solar plants with 181 MW of capacity, and Apex Solar's 80 MW is 44% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| MTSUN | Yellowstone | 80 | 149,035 |
| Apex Solar | Beaverhead | 80 | 164,724 |
Source: EIA Forms EIA-860 and EIA-923, 2025.