Skip to main content
RateWatt

Natural gas power plant, Texas

Arthur Von Rosenberg natural gas power plant, Texas

Arthur Von Rosenberg is a 575 MW natural gas power plant in Bexar County, Texas, operated by City of San Antonio-(TX), and it generated 3,613,377 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Texas, and its capacity factor sits at the 92nd percentile of U.S. natural gas plants. By 2025 generation it ranks 325th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

575 MWNameplate capacity
79%Capacity factor, 2025, 92nd percentile, on 520 MW net summer
0.6%Of TX generation, 2025
25 yearsAverage generator age, by MW

How hard does the Arthur Von Rosenberg plant run compared with other natural gas plants?

The Arthur Von Rosenberg plant had a capacity factor of 79% in 2025 on 520 MW of net summer capacity, the 92nd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 290 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Arthur Von Rosenberg79%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Arthur Von Rosenberg plant generating more or less than last year?

Generation at Arthur Von Rosenberg rose 19.7% from 2024 to 2025, from 3,019,748 MWh to 3,613,377 MWh. Through August 2026 it is running 6.7% behind the same months of 2025.

1 month shows net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
20243,019,748
20253,613,377
2026 through August2,326,607
2025, same months2,493,306
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026382,906
July 2026377,422
June 2026371,246
May 2026378,397
April 202677,833
March 202658,003
February 2026307,469
January 2026373,331
December 2025118,412
November 2025249,534
October 2025381,429
September 2025370,696
August 2025384,449
July 2025373,878
June 2025360,212
May 2025365,390
April 2025297,216
March 2025-508
February 2025336,405
January 2025376,264
December 2024334,621
November 2024192,659
October 202435,546
September 2024333,497
August 2024365,181
July 2024351,819
June 2024327,474
May 2024169,512
April 202466,358
March 2024335,480
February 2024187,342
January 2024320,259

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Arthur Von Rosenberg plant?

Arthur Von Rosenberg made 0.6% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.3% of the state's 195,966 MW of capacity. Its share of output is 2.1 times its share of capacity. By capacity it is the 77th largest of 1,023 plants in Texas, the 646th largest of 14,327 in the U.S. and the 400th largest of 1,962 natural gas plants. By 2025 generation it is the 38th largest of 816 generating plants in the state.

Arthur Von Rosenberg within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)575195,9660.3%
Generation (MWh)3,613,377592,896,1760.6%
Natural gas capacity (MW)57581,5740.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Arthur Von Rosenberg plant, and when do they retire?

3 operable generators total 575 MW, with an average age of 25 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s3575100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combined Cycle1882000n/a
2OperatingNatural Gas Fired Combined Cycle1882000n/a
3OperatingNatural Gas Fired Combined Cycle2002000n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Arthur Von Rosenberg plant?

EIA lists no joint owners for Arthur Von Rosenberg. City of San Antonio-(TX) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of San Antonio charge homes?

City of San Antonio, the operator of Arthur Von Rosenberg, had an average residential price of 12.40¢ per kWh and an average bill of $133 a month in 2025, 19% below the Texas average of 15.40¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Texas
City of San Antonio12.40¢$13319% lower
Texas average15.40¢$171
U.S. average17.23¢$15112% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Arthur Von Rosenberg plant?

Arthur Von Rosenberg is in Elmendorf, Bexar County, Texas, at 29.2570° N, 98.3840° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Texas are similar in size?

Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Arthur Von Rosenberg's 575 MW is 1% of that.

Natural gas plants in Texas around this size
PlantCountyMW2025 MWh
Elk StationHale599890,917
Sabine River OperationsOrange5952,809,177
Corpus Christi Energy CenterNueces5932,189,259
Arthur Von RosenbergBexar5753,613,377
Thomas C FergusonLlano5753,630,050
Sweeny Cogen FacilityBrazoria5722,300,495
Harrison County Power ProjectHarrison5702,565,558

Source: EIA Forms EIA-860 and EIA-923, 2025.