Skip to main content
RateWatt

Solar power plant, Michigan

Assembly Solar Project, Michigan

Assembly Solar Project is a 50 MW solar power plant in Shiawassee County, Michigan, operated by Assembly Solar I, LLC, and it generated 99,840 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Michigan, and its capacity factor sits at the 48th percentile of U.S. solar plants. By 2025 generation it ranks 3,390th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
23%Capacity factor, 2025, 48th percentile, on 50 MW net summer
0.1%Of MI generation, 2025
5 yearsAverage generator age, by MW

How hard does the Assembly Solar Project plant run compared with other solar plants?

The Assembly Solar Project plant had a capacity factor of 23% in 2025 on 50 MW of net summer capacity, the 48th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Assembly Solar Project23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Assembly Solar Project plant generating more or less than last year?

Generation at Assembly Solar Project fell 2.4% from 2024 to 2025, from 102,325 MWh to 99,840 MWh. Through August 2026 it is running 1.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024102,325
202599,840
2026 through August76,239
2025, same months75,264
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202611,061
July 202614,166
June 202611,521
May 202612,279
April 20269,153
March 20267,373
February 20266,488
January 20264,198
December 20252,948
November 20253,829
October 20257,482
September 202510,317
August 20259,020
July 202513,636
June 202513,206
May 202511,831
April 20259,809
March 20258,752
February 20254,802
January 20254,208
December 20242,307
November 20243,260
October 20248,905
September 202410,535
August 202412,751
July 202413,343
June 202412,610
May 202413,502
April 20248,773
March 20247,140
February 20246,816
January 20242,383

Source: EIA Form EIA-923, through August 2026.

How much of Michigan's electricity comes from the Assembly Solar Project plant?

Assembly Solar Project made 0.1% of the 127,929,498 MWh reported by Michigan plants in 2025, from 0.1% of the state's 34,725 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 84th largest of 283 plants in Michigan, the 3,754th largest of 14,327 in the U.S. and the 884th largest of 7,223 solar plants. By 2025 generation it is the 82nd largest of 261 generating plants in the state.

Assembly Solar Project within Michigan, 2025
MeasureThis plantMichiganShare
Capacity (MW)5034,7250.1%
Generation (MWh)99,840127,929,4980.1%
Solar capacity (MW)501,9672.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Assembly Solar Project plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ASP01OperatingSolar Photovoltaic502020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Assembly Solar Project plant?

EIA lists no joint owners for Assembly Solar Project. Assembly Solar I, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Assembly Solar Project plant?

Assembly Solar Project is in Venice Township, Shiawassee County, Michigan, at 43.0227° N, 83.9453° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Michigan are similar in size?

Michigan has 70 operable solar plants with 1,967 MW of capacity, and Assembly Solar Project's 50 MW is 3% of that.

Solar plants in Michigan around this size
PlantCountyMW2025 MWh
Polaris Solar ParkGratiot10058,951
Pine River Solar ParkGratiot8078,143
Assembly Solar IIIShiawassee79164,992
Assembly Solar ProjectShiawassee5099,840
Genesee Solar ProjectGenesee411,046
Demille Solar FarmLapeer2835,810

Source: EIA Forms EIA-860 and EIA-923, 2025.