Solar power plant, Michigan
Assembly Solar Project, Michigan
Assembly Solar Project is a 50 MW solar power plant in Shiawassee County, Michigan, operated by Assembly Solar I, LLC, and it generated 99,840 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Michigan, and its capacity factor sits at the 48th percentile of U.S. solar plants. By 2025 generation it ranks 3,390th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Assembly Solar Project plant run compared with other solar plants?
The Assembly Solar Project plant had a capacity factor of 23% in 2025 on 50 MW of net summer capacity, the 48th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Assembly Solar Project | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Assembly Solar Project plant generating more or less than last year?
Generation at Assembly Solar Project fell 2.4% from 2024 to 2025, from 102,325 MWh to 99,840 MWh. Through August 2026 it is running 1.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 102,325 |
| 2025 | 99,840 |
| 2026 through August | 76,239 |
| 2025, same months | 75,264 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 11,061 |
| July 2026 | 14,166 |
| June 2026 | 11,521 |
| May 2026 | 12,279 |
| April 2026 | 9,153 |
| March 2026 | 7,373 |
| February 2026 | 6,488 |
| January 2026 | 4,198 |
| December 2025 | 2,948 |
| November 2025 | 3,829 |
| October 2025 | 7,482 |
| September 2025 | 10,317 |
| August 2025 | 9,020 |
| July 2025 | 13,636 |
| June 2025 | 13,206 |
| May 2025 | 11,831 |
| April 2025 | 9,809 |
| March 2025 | 8,752 |
| February 2025 | 4,802 |
| January 2025 | 4,208 |
| December 2024 | 2,307 |
| November 2024 | 3,260 |
| October 2024 | 8,905 |
| September 2024 | 10,535 |
| August 2024 | 12,751 |
| July 2024 | 13,343 |
| June 2024 | 12,610 |
| May 2024 | 13,502 |
| April 2024 | 8,773 |
| March 2024 | 7,140 |
| February 2024 | 6,816 |
| January 2024 | 2,383 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Assembly Solar Project plant, and when do they retire?
1 operable generator totals 50 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 50 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ASP01 | Operating | Solar Photovoltaic | 50 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Assembly Solar Project plant?
EIA lists no joint owners for Assembly Solar Project. Assembly Solar I, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Assembly Solar Project plant?
Assembly Solar Project is in Venice Township, Shiawassee County, Michigan, at 43.0227° N, 83.9453° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Michigan are similar in size?
Michigan has 70 operable solar plants with 1,967 MW of capacity, and Assembly Solar Project's 50 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Polaris Solar Park | Gratiot | 100 | 58,951 |
| Pine River Solar Park | Gratiot | 80 | 78,143 |
| Assembly Solar III | Shiawassee | 79 | 164,992 |
| Assembly Solar Project | Shiawassee | 50 | 99,840 |
| Genesee Solar Project | Genesee | 41 | 1,046 |
| Demille Solar Farm | Lapeer | 28 | 35,810 |
Source: EIA Forms EIA-860 and EIA-923, 2025.