Natural gas power plant, Kansas

Augusta Electric Plant No 2 natural gas power plant, Kansas

Augusta Electric Plant No 2 is a 20.7 MW natural gas power plant in Butler County, Kansas, operated by City of Augusta-(KS), and it generated 832 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 4th percentile of U.S. natural gas plants. By 2025 generation it ranks 11,944th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20.7 MWNameplate capacity
under 1%Capacity factor, 2025, 4th percentile, on 20.1 MW net summer
11,944thU.S. rank by generation, 2025
41 yearsAverage generator age, by MW

How hard does the Augusta Electric Plant No 2 plant run compared with other natural gas plants?

The Augusta Electric Plant No 2 plant had a capacity factor of under 1% in 2025 on 20.1 MW of net summer capacity, the 4th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Augusta Electric Plant No 2under 1%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Augusta Electric Plant No 2 plant generating more or less than last year?

Generation at Augusta Electric Plant No 2 fell 48.2% from 2024 to 2025, from 1,605 MWh to 832 MWh.

Net generation by period
PeriodMWh
20241,605
2025832
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202556
November 202562
October 202563
September 202573
August 202591
July 2025103
June 202577
May 202585
April 202525
March 202561
February 202562
January 202573
December 2024105
November 2024130
October 2024106
September 2024131
August 2024172
July 2024183
June 2024138
May 2024138
April 2024105
March 2024130
February 2024122
January 2024145

Source: EIA Form EIA-923, through August 2026.

How much of Kansas' electricity comes from the Augusta Electric Plant No 2 plant?

Augusta Electric Plant No 2 made 0.0% of the 61,984,540 MWh reported by Kansas plants in 2025, from 0.1% of the state's 20,969 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 86th largest of 190 plants in Kansas, the 4,760th largest of 14,327 in the U.S. and the 1,286th largest of 1,962 natural gas plants. By 2025 generation it is the 129th largest of 173 generating plants in the state.

Augusta Electric Plant No 2 within Kansas, 2025
MeasureThis plantKansasShare
Capacity (MW)2120,9690.1%
Generation (MWh)83261,984,5400.0%
Natural gas capacity (MW)213,8800.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Augusta Electric Plant No 2 plant, and when do they retire?

4 operable generators total 20.7 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s2839%none reported
1980s1629%none reported
2000s1732%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Internal Combustion Engine41968n/a
2OperatingNatural Gas Internal Combustion Engine41968n/a
3OperatingNatural Gas Internal Combustion Engine61981n/a
4OperatingNatural Gas Internal Combustion Engine72005n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Augusta Electric Plant No 2 plant?

EIA lists no joint owners for Augusta Electric Plant No 2. City of Augusta-(KS) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Augusta charge homes?

City of Augusta, the operator of Augusta Electric Plant No 2, had an average residential price of 13.67¢ per kWh and an average bill of $110 a month in 2019, 5% below the Kansas average of 14.44¢.

Average residential price and bill, 2019
MeasurePriceMonthly billAgainst Kansas
City of Augusta13.67¢$1105% lower
Kansas average14.44¢$126
U.S. average17.23¢$15119% higher

Source: EIA Form EIA-861, final 2019. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Augusta Electric Plant No 2 plant?

Augusta Electric Plant No 2 is in Augusta, Butler County, Kansas, at 37.6861° N, 96.9650° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Kansas are similar in size?

Kansas has 54 operable natural gas plants with 3,880 MW of capacity, and Augusta Electric Plant No 2's 20.7 MW is 1% of that.

Natural gas plants in Kansas around this size
PlantCountyMW2025 MWh
Jameson Energy CenterFinney28175
East 12th StreetCowley2710,514
Chanute 3Neosho23260
Augusta Electric Plant No 2Butler21768
Wellington 1Sumner206,091
Wellington 2Sumner203,114
BeloitMitchell1937

Source: EIA Forms EIA-860 and EIA-923, 2025.