Skip to main content
RateWatt

Natural gas power plant, Kansas

Wellington 2 natural gas power plant, Kansas

Wellington 2 is a 20 MW natural gas power plant in Sumner County, Kansas, operated by City of Wellington-(KS), and it generated 3,114 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 13th percentile of U.S. natural gas plants. By 2025 generation it ranks 9,602nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
2%Capacity factor, 2025, 13th percentile, on 21 MW net summer
9,602ndU.S. rank by generation, 2025
36 yearsAverage generator age, by MW

How hard does the Wellington 2 plant run compared with other natural gas plants?

The Wellington 2 plant had a capacity factor of 2% in 2025 on 21 MW of net summer capacity, the 13th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 6 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Wellington 22%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Wellington 2 plant generating more or less than last year?

Generation at Wellington 2 rose 28.6% from 2024 to 2025, from 2,421 MWh to 3,114 MWh.

Net generation by period
PeriodMWh
20242,421
20253,114
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025199
November 2025233
October 2025235
September 2025279
August 2025348
July 2025402
June 2025282
May 2025334
April 202585
March 2025224
February 2025226
January 2025267
December 2024154
November 2024198
October 2024153
September 2024213
August 2024280
July 2024308
June 2024223
May 2024209
April 2024155
March 2024193
February 2024164
January 2024172

Source: EIA Form EIA-923, through August 2026.

How much of Kansas' electricity comes from the Wellington 2 plant?

Wellington 2 made 0.0% of the 61,984,540 MWh reported by Kansas plants in 2025, from 0.1% of the state's 20,969 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 89th largest of 190 plants in Kansas, the 4,775th largest of 14,327 in the U.S. and the 1,290th largest of 1,962 natural gas plants. By 2025 generation it is the 96th largest of 173 generating plants in the state.

Wellington 2 within Kansas, 2025
MeasureThis plantKansasShare
Capacity (MW)2020,9690.1%
Generation (MWh)3,11461,984,5400.0%
Natural gas capacity (MW)203,8800.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Wellington 2 plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 36 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
6OperatingNatural Gas Fired Combustion Turbine201989n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Wellington 2 plant?

EIA lists no joint owners for Wellington 2. City of Wellington-(KS) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Wellington charge homes?

City of Wellington, the operator of Wellington 2, had an average residential price of 16.29¢ per kWh and an average bill of $124 a month in 2019, 13% above the Kansas average of 14.44¢.

Average residential price and bill, 2019
MeasurePriceMonthly billAgainst Kansas
City of Wellington16.29¢$12413% higher
Kansas average14.44¢$126
U.S. average17.23¢$15119% higher

Source: EIA Form EIA-861, final 2019. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Wellington 2 plant?

Wellington 2 is in Wellington, Sumner County, Kansas, at 37.2678° N, 97.3497° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Kansas are similar in size?

Kansas has 54 operable natural gas plants with 3,880 MW of capacity, and Wellington 2's 20 MW is 1% of that.

Natural gas plants in Kansas around this size
PlantCountyMW2025 MWh
Chanute 3Neosho23260
Augusta Electric Plant No 2Butler21768
Wellington 1Sumner206,091
Wellington 2Sumner203,114
BeloitMitchell1937
OttawaFranklin19-75
Kingman Municipal Power and Light PlantKingman19947

Source: EIA Forms EIA-860 and EIA-923, 2025.