Wind power plant, Iowa
Barton Windpower LLC wind power plant, Iowa
Barton Windpower LLC is a 158 MW wind power plant in Worth County, Iowa, operated by Avangrid Power LLC, and it generated 365,425 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Iowa, and its capacity factor sits at the 27th percentile of U.S. wind plants. By 2025 generation it ranks 1,708th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Barton Windpower LLC plant run compared with other wind plants?
The Barton Windpower LLC plant had a capacity factor of 26% in 2025 on 158 MW of net summer capacity, the 27th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 96 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Barton Windpower LLC | 26% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Barton Windpower LLC plant generating more or less than last year?
Generation at Barton Windpower LLC rose 1.2% from 2024 to 2025, from 360,941 MWh to 365,425 MWh.
| Period | MWh |
|---|---|
| 2024 | 360,941 |
| 2025 | 365,425 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 42,315 |
| November 2025 | 37,983 |
| October 2025 | 37,190 |
| September 2025 | 18,578 |
| August 2025 | 15,253 |
| July 2025 | 14,921 |
| June 2025 | 21,036 |
| May 2025 | 22,553 |
| April 2025 | 36,562 |
| March 2025 | 44,869 |
| February 2025 | 35,129 |
| January 2025 | 39,036 |
| December 2024 | 36,791 |
| November 2024 | 43,505 |
| October 2024 | 41,631 |
| September 2024 | 24,254 |
| August 2024 | 19,602 |
| July 2024 | 16,066 |
| June 2024 | 17,844 |
| May 2024 | 28,816 |
| April 2024 | 30,367 |
| March 2024 | 36,381 |
| February 2024 | 37,389 |
| January 2024 | 28,295 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Barton Windpower LLC plant, and when do they retire?
2 operable generators total 158 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 158 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 80 | 2009 | n/a |
| 2 | Operating | Onshore Wind Turbine | 78 | 2009 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Barton Windpower LLC plant?
EIA lists no joint owners for Barton Windpower LLC. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Barton Windpower LLC plant?
Barton Windpower LLC is in Kensett, Worth County, Iowa, at 43.3930° N, 93.0910° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Iowa are similar in size?
Iowa has 123 operable wind plants with 13,410 MW of capacity, and Barton Windpower LLC's 158 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Prairie Wind Farm | Mahaska | 168 | 591,772 |
| Walnut Wind Farm | Pottawattamie | 165 | 558,301 |
| Carroll Wind Farm | Carroll | 159 | 556,550 |
| Barton Windpower LLC | Worth | 158 | 365,425 |
| Adams Wind | Adams | 154 | 460,387 |
| Kossuth | Kossuth | 152 | 532,504 |
| Vienna Wind Farm | Marshall | 150 | 621,748 |
Source: EIA Forms EIA-860 and EIA-923, 2025.