Natural gas power plant, Texas
Bastrop Energy Center, Texas
Bastrop Energy Center is a 619 MW natural gas power plant in Bastrop County, Texas, operated by Bastrop Energy Partners, LP, and it generated 2,298,192 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Texas, and its capacity factor sits at the 68th percentile of U.S. natural gas plants. By 2025 generation it ranks 464th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Bastrop Energy Center plant run compared with other natural gas plants?
The Bastrop Energy Center plant had a capacity factor of 46% in 2025 on 575 MW of net summer capacity, the 68th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 167 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Bastrop Energy Center | 46% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Bastrop Energy Center plant generating more or less than last year?
Generation at Bastrop Energy Center fell 24.2% from 2024 to 2025, from 3,033,754 MWh to 2,298,192 MWh. Through August 2026 it is running 2.2% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 3,033,754 |
| 2025 | 2,298,192 |
| 2026 through August | 1,862,209 |
| 2025, same months | 1,904,140 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 373,975 |
| July 2026 | 349,788 |
| June 2026 | 353,213 |
| May 2026 | 300,955 |
| April 2026 | 52,238 |
| March 2026 | 168,914 |
| February 2026 | 13,681 |
| January 2026 | 249,445 |
| December 2025 | 93,213 |
| November 2025 | 0 |
| October 2025 | 0 |
| September 2025 | 300,839 |
| August 2025 | 375,437 |
| July 2025 | 348,436 |
| June 2025 | 298,601 |
| May 2025 | 0 |
| April 2025 | 84,453 |
| March 2025 | 254,819 |
| February 2025 | 204,169 |
| January 2025 | 338,225 |
| December 2024 | 313,011 |
| November 2024 | 309,774 |
| October 2024 | 63,253 |
| September 2024 | 328,542 |
| August 2024 | 363,765 |
| July 2024 | 362,315 |
| June 2024 | 352,087 |
| May 2024 | 326,680 |
| April 2024 | 38,052 |
| March 2024 | 290,702 |
| February 2024 | 113,757 |
| January 2024 | 171,816 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Bastrop Energy Center plant, and when do they retire?
3 operable generators total 619 MW, with an average age of 23 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 3 | 619 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 0001 | Operating | Natural Gas Fired Combined Cycle | 188 | 2002 | n/a |
| 0002 | Operating | Natural Gas Fired Combined Cycle | 188 | 2002 | n/a |
| 0003 | Operating | Natural Gas Fired Combined Cycle | 242 | 2002 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Bastrop Energy Center plant?
EIA lists no joint owners for Bastrop Energy Center. Bastrop Energy Partners, LP operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Bastrop Energy Center plant?
Bastrop Energy Center is in Cedar Creek, Bastrop County, Texas, at 30.1458° N, 97.5500° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Texas are similar in size?
Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Bastrop Energy Center's 619 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Odyssey Energy Altura Cogen, LLC | Harris | 644 | 3,444,109 |
| Graham | Young | 635 | 1,136,108 |
| Sim Gideon | Bastrop | 623 | 826,681 |
| Bastrop Energy Center | Bastrop | 619 | 2,298,192 |
| Lost Pines 1 Power Project | Bastrop | 609 | 2,599,377 |
| Topaz Generating | Galveston | 605 | 598,589 |
| R W Miller | Palo Pinto | 604 | 879,542 |
Source: EIA Forms EIA-860 and EIA-923, 2025.