Skip to main content
RateWatt

Natural gas power plant, Texas

Lost Pines 1 Power Project, Texas

Lost Pines 1 Power Project is a 609 MW natural gas power plant in Bastrop County, Texas, operated by Lower Colorado River Authority, and it generated 2,599,377 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Texas, and its capacity factor sits at the 76th percentile of U.S. natural gas plants. By 2025 generation it ranks 432nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

609 MWNameplate capacity
58%Capacity factor, 2025, 76th percentile, on 510 MW net summer
0.4%Of TX generation, 2025
24 yearsAverage generator age, by MW

How hard does the Lost Pines 1 Power Project plant run compared with other natural gas plants?

The Lost Pines 1 Power Project plant had a capacity factor of 58% in 2025 on 510 MW of net summer capacity, the 76th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 212 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lost Pines 1 Power Project58%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Lost Pines 1 Power Project plant generating more or less than last year?

Generation at Lost Pines 1 Power Project fell 4.7% from 2024 to 2025, from 2,728,001 MWh to 2,599,377 MWh. Through August 2026 it is running 0.1% behind the same months of 2025.

Net generation by period
PeriodMWh
20242,728,001
20252,599,377
2026 through August1,581,848
2025, same months1,584,190
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026362,856
July 2026356,631
June 2026335,880
May 202660,531
April 20260
March 2026146,408
February 2026187,351
January 2026132,191
December 2025216,031
November 2025148,192
October 2025311,407
September 2025339,557
August 2025356,599
July 2025336,910
June 2025317,468
May 2025220,319
April 202590,165
March 202523,518
February 2025104,796
January 2025134,415
December 202474,492
November 20243,064
October 2024317,211
September 2024328,873
August 2024333,769
July 2024215,682
June 2024284,194
May 2024349,166
April 2024217,203
March 2024156,219
February 2024183,951
January 2024264,177

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Lost Pines 1 Power Project plant?

Lost Pines 1 Power Project made 0.4% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.3% of the state's 195,966 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 69th largest of 1,023 plants in Texas, the 591st largest of 14,327 in the U.S. and the 362nd largest of 1,962 natural gas plants. By 2025 generation it is the 55th largest of 816 generating plants in the state.

Lost Pines 1 Power Project within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)609195,9660.3%
Generation (MWh)2,599,377592,896,1760.4%
Natural gas capacity (MW)60981,5740.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Lost Pines 1 Power Project plant, and when do they retire?

3 operable generators total 609 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s3609100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CTAOperatingNatural Gas Fired Combined Cycle2032001n/a
CTBOperatingNatural Gas Fired Combined Cycle2032001n/a
STOperatingNatural Gas Fired Combined Cycle2042001n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Lost Pines 1 Power Project plant?

2 owners report shares in Lost Pines 1 Power Project; Lower Colorado River Authority holds the largest named share, 50.0% or about 305 MW. Lower Colorado River Authority operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Lower Colorado River Authority50.0%3051,299,689
GENTEX Power Corp50.0%3051,299,689

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Lost Pines 1 Power Project plant?

Lost Pines 1 Power Project is in Bastrop, Bastrop County, Texas, at 30.1478° N, 97.2714° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Texas are similar in size?

Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Lost Pines 1 Power Project's 609 MW is 1% of that.

Natural gas plants in Texas around this size
PlantCountyMW2025 MWh
GrahamYoung6351,136,108
Sim GideonBastrop623826,681
Bastrop Energy CenterBastrop6192,298,192
Lost Pines 1 Power ProjectBastrop6092,599,377
Topaz GeneratingGalveston605598,589
R W MillerPalo Pinto604879,542
Freeport EnergyBrazoria6031,709,962

Source: EIA Forms EIA-860 and EIA-923, 2025.