Natural gas power plant, Florida

Big Bend natural gas power plant, Florida

Big Bend is a 1,797 MW natural gas power plant in Hillsborough County, Florida, operated by Tampa Electric Co, and it generated 7,473,386 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.8% of the generation reported in Florida, and its capacity factor sits at the 75th percentile of U.S. natural gas plants. By 2025 generation it ranks 118th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,797 MWNameplate capacity
57%Capacity factor, 2025, 75th percentile, on 1,491 MW net summer
2.8%Of FL generation, 2025
27 yearsAverage generator age, by MW

How hard does the Big Bend plant run compared with other natural gas plants?

The Big Bend plant had a capacity factor of 57% in 2025 on 1,491 MW of net summer capacity, the 75th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 207 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Big Bend57%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Big Bend plant generating more or less than last year?

Generation at Big Bend rose 4.2% from 2024 to 2025, from 7,169,249 MWh to 7,473,386 MWh. Through August 2026 it is running 2.9% behind the same months of 2025. Only 7 months of 2026 have been reported for this plant.

Net generation by period
PeriodMWh
20247,169,249
20257,473,386
2026 through August4,208,977
2025, same months4,335,300
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026660,271
July 2026775,387
June 2026677,910
May 2026595,716
April 2026202,484
March 2026614,764
February 2026682,445
December 2025690,627
November 2025409,798
October 2025639,895
September 2025594,460
August 2025771,716
July 2025777,046
June 2025638,237
May 2025778,095
April 2025480,993
March 2025467,547
February 2025421,666
January 2025803,306
December 2024668,288
November 2024455,118
October 2024296,864
September 2024642,507
August 2024709,005
July 2024706,203
June 2024603,779
May 2024571,521
April 2024513,797
March 2024599,164
February 2024626,153
January 2024776,850

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Big Bend plant?

Big Bend made 2.8% of the 267,867,735 MWh reported by Florida plants in 2025, from 2.2% of the state's 79,936 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 13th largest of 331 plants in Florida, the 97th largest of 14,327 in the U.S. and the 24th largest of 1,962 natural gas plants. By 2025 generation it is the 10th largest of 313 generating plants in the state.

Big Bend within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)1,79779,9362.2%
Generation (MWh)7,473,386267,867,7352.8%
Natural gas capacity (MW)1,79752,8943.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Big Bend plant, and when do they retire?

5 operable generators total 1,797 MW, with an average age of 27 years weighted by capacity at the end of 2025. 486 MW, 27% of operable capacity, has a planned retirement, the first in 2040. 5 have already retired, totalling 1,066 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s144625%none reported
1980s148627%2040
2000s1704%none reported
2020s279644%none reported
Capacity retiring by year
YearUnitsMW retiringShare of plant
2040148627%
Every generator, 10 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ST1OperatingNatural Gas Fired Combined Cycle4461970n/a
ST4OperatingNatural Gas Steam Turbine48619852040
GT4OperatingNatural Gas Fired Combustion Turbine702009n/a
GT5OperatingNatural Gas Fired Combined Cycle3982021n/a
GT6OperatingNatural Gas Fired Combined Cycle3982021n/a
GT1RetiredPetroleum Liquids1819692008
ST2RetiredConventional Steam Coal44619732021
GT2RetiredPetroleum Liquids7919742008
GT3RetiredPetroleum Liquids7919742008
ST3RetiredNatural Gas Steam Turbine44619762023

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Big Bend plant?

EIA lists no joint owners for Big Bend. Tampa Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Tampa Electric Co charge homes?

Tampa Electric Co, the operator of Big Bend, had an average residential price of 17.32¢ per kWh and an average bill of $194 a month in 2025, 14% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Tampa Electric Co17.32¢$19414% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Big Bend plant?

Big Bend is in Apollo Beach, Hillsborough County, Florida, at 27.7944° N, 82.4036° W. It sits in the Tampa Electric Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Florida are similar in size?

Florida has 68 operable natural gas plants with 52,894 MW of capacity, and Big Bend's 1,797 MW is 3% of that.

Natural gas plants in Florida around this size
PlantCountyMW2025 MWh
Hines Energy ComplexPolk2,26611,753,916
Gulf Clean Energy CenterEscambia2,1082,035,714
Crystal RiverCitrus1,97111,470,840
Big BendHillsborough1,7977,410,720
Okeechobee Clean Energy CenterOkeechobee1,72311,986,344
PolkPolk1,4584,273,697
Dania Beach 7Broward1,4486,081,688

Source: EIA Forms EIA-860 and EIA-923, 2025.