Crystal River natural gas power plant, Florida

Crystal River is a 3,449 MW power plant, 1,971 MW of it natural gas, in Citrus County, Florida, operated by Duke Energy Florida, LLC, and it generated 15,307,405 MWh in 2025 (Forms EIA-860 and EIA-923). That is 5.7% of the generation reported in Florida, and its capacity factor sits at the 94th percentile of U.S. natural gas plants. By 2025 generation it ranks 31st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

3,449 MWNameplate capacity
81%Capacity factor, 2025, natural gas units, 94th percentile, on 1,617 MW net summer
5.7%Of FL generation, 2025
22 yearsAverage generator age, by MW

How hard does the Crystal River plant run compared with other natural gas plants?

The Crystal River plant's natural gas units had a capacity factor of 81% in 2025 on 1,617 MW of net summer capacity, the 94th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 296 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Crystal River81%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the Crystal River plant generating more or less than last year?

Generation at Crystal River fell 1.1% from 2024 to 2025, from 15,470,904 MWh to 15,307,405 MWh. Through August 2026 it is running 5.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202415,470,904
202515,307,405
2026 through August11,072,035
2025, same months10,547,294
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20261,604,692
July 20261,540,028
June 20261,496,887
May 20261,622,451
April 2026879,000
March 2026902,647
February 20261,301,330
January 20261,725,000
December 20251,306,193
November 20251,000,266
October 2025985,814
September 20251,467,838
August 20251,479,001
July 20251,461,321
June 20251,571,472
May 20251,423,109
April 20251,052,283
March 20251,111,893
February 2025919,299
January 20251,528,916
December 2024923,066
November 20241,014,283
October 20241,136,704
September 20241,449,054
August 20241,555,994
July 20241,685,811
June 20241,548,198
May 20241,381,111
April 20241,264,300
March 20241,227,442
February 2024770,870
January 20241,514,071

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Crystal River plant?

Crystal River made 5.7% of the 267,867,735 MWh reported by Florida plants in 2025, from 4.3% of the state's 79,936 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 2nd largest of 331 plants in Florida, the 8th largest of 14,327 in the U.S. and the 19th largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 4th largest of 313 generating plants in the state.

Crystal River within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)3,44979,9364.3%
Generation (MWh)15,307,405267,867,7355.7%
Natural gas capacity (MW)1,97152,8943.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Crystal River plant, and when do they retire?

8 operable generators total 3,449 MW, with an average age of 22 years weighted by capacity at the end of 2025. 1,478 MW, 43% of operable capacity, has a planned retirement, the first in 2034. 3 have already retired, totalling 1,855 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s21,47843%2034
2010s61,97157%none reported
Capacity retiring by year
YearUnitsMW retiringShare of plant
203421,47843%
Every generator, 11 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ST4OperatingConventional Steam Coal73919822034
5OperatingConventional Steam Coal73919842034
1GTAOperatingNatural Gas Fired Combined Cycle3102018n/a
1GTBOperatingNatural Gas Fired Combined Cycle3102018n/a
2GTAOperatingNatural Gas Fired Combined Cycle3102018n/a
2GTBOperatingNatural Gas Fired Combined Cycle3102018n/a
CC1STOperatingNatural Gas Fired Combined Cycle3652018n/a
CC2STOperatingNatural Gas Fired Combined Cycle3652018n/a
1RetiredConventional Steam Coal44119662018
2RetiredConventional Steam Coal52419692018
3RetiredNuclear89019772013

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Crystal River plant?

EIA lists no joint owners for Crystal River. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Crystal River, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Crystal River plant use?

Crystal River has capacity on 2 fuels: 57% natural gas and 43% coal. In 2025, natural gas made 75% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas1,97157.1%11,470,840
Coal1,47842.9%3,808,809

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Crystal River plant?

Crystal River is in Crystal River, Citrus County, Florida, at 28.9656° N, 82.6977° W. It sits in the Progress Energy Florida balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Florida are similar in size?

Florida has 68 operable natural gas plants with 52,894 MW of capacity, and Crystal River's 1,971 MW is 4% of that.

Natural gas plants in Florida around this size
PlantCountyMW2025 MWh
H L Culbreath Bayside Power StationHillsborough2,2945,764,731
Hines Energy ComplexPolk2,26611,753,916
Gulf Clean Energy CenterEscambia2,1082,035,714
Crystal RiverCitrus1,97111,470,840
Big BendHillsborough1,7977,410,720
Okeechobee Clean Energy CenterOkeechobee1,72311,986,344
PolkPolk1,4584,273,697

Source: EIA Forms EIA-860 and EIA-923, 2025.