Wind power plant, Washington

Big Horn Wind II power plant, Washington

Big Horn Wind II is a 50 MW wind power plant in Klickitat County, Washington, operated by Avangrid Power LLC, and it generated 105,137 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Washington, and its capacity factor sits at the 18th percentile of U.S. wind plants. By 2025 generation it ranks 3,339th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
24%Capacity factor, 2025, 18th percentile, on 50 MW net summer
0.1%Of WA generation, 2025
14 yearsAverage generator age, by MW

How hard does the Big Horn Wind II plant run compared with other wind plants?

The Big Horn Wind II plant had a capacity factor of 24% in 2025 on 50 MW of net summer capacity, the 18th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 88 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Big Horn Wind II24%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Big Horn Wind II plant generating more or less than last year?

Generation at Big Horn Wind II fell 5.4% from 2024 to 2025, from 111,174 MWh to 105,137 MWh. Through August 2026 it is running 13.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024111,174
2025105,137
2026 through August77,191
2025, same months68,035
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20266,601
July 20268,366
June 202611,503
May 202610,127
April 202610,650
March 202615,997
February 20266,484
January 20267,463
December 202512,759
November 20258,434
October 202510,387
September 20255,522
August 20257,520
July 20257,671
June 20258,747
May 20259,770
April 20257,547
March 202512,286
February 20258,270
January 20256,224
December 20247,559
November 20249,243
October 20247,105
September 20246,439
August 20248,415
July 20246,497
June 202410,440
May 202412,416
April 202413,855
March 202410,684
February 20249,581
January 20248,940

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Big Horn Wind II plant?

Big Horn Wind II made 0.1% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.2% of the state's 31,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 73rd largest of 139 plants in Washington, the 3,754th largest of 14,327 in the U.S. and the 880th largest of 1,358 wind plants. By 2025 generation it is the 77th largest of 129 generating plants in the state.

Big Horn Wind II within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)5031,7120.2%
Generation (MWh)105,137101,512,8620.1%
Wind capacity (MW)503,3871.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Big Horn Wind II plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine502011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Big Horn Wind II plant?

EIA lists no joint owners for Big Horn Wind II. Avangrid Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Big Horn Wind II plant?

Big Horn Wind II is in Bickleton, Klickitat County, Washington, at 45.9192° N, 120.3039° W. It sits in the Avangrid Renewables LLC balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Washington are similar in size?

Washington has 23 operable wind plants with 3,387 MW of capacity, and Big Horn Wind II's 50 MW is 1% of that.

Wind plants in Washington around this size
PlantCountyMW2025 MWh
Harvest Wind ProjectKlickitat99244,403
Nine CanyonBenton96185,765
Vantage Wind Energy LLCKittitas90253,206
Big Horn Wind IIKlickitat50105,137
Linden Wind Energy ProjectKlickitat50104,333

Source: EIA Forms EIA-860 and EIA-923, 2025.