Skip to main content
RateWatt

Wind power plant, Washington

Linden Wind Energy Project, Washington

Linden Wind Energy Project is a 50 MW wind power plant in Klickitat County, Washington, operated by Los Angeles Department of Water & Power, and it generated 104,333 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Washington, and its capacity factor sits at the 18th percentile of U.S. wind plants. By 2025 generation it ranks 3,346th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
24%Capacity factor, 2025, 18th percentile, on 50 MW net summer
0.1%Of WA generation, 2025
15 yearsAverage generator age, by MW

How hard does the Linden Wind Energy Project plant run compared with other wind plants?

The Linden Wind Energy Project plant had a capacity factor of 24% in 2025 on 50 MW of net summer capacity, the 18th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 87 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Linden Wind Energy Project24%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Linden Wind Energy Project plant generating more or less than last year?

Generation at Linden Wind Energy Project rose 8.1% from 2024 to 2025, from 96,525 MWh to 104,333 MWh.

Net generation by period
PeriodMWh
202496,525
2025104,333
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202510,774
November 20257,406
October 20258,924
September 20257,167
August 202510,115
July 202511,206
June 202511,679
May 202511,624
April 20259,309
March 20258,955
February 20254,743
January 20252,431
December 20242,037
November 20243,013
October 20243,002
September 20241,665
August 20248,301
July 202411,595
June 202412,398
May 202416,631
April 202413,630
March 20248,482
February 20249,898
January 20245,873

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Linden Wind Energy Project plant?

Linden Wind Energy Project made 0.1% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.2% of the state's 31,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 73rd largest of 139 plants in Washington, the 3,754th largest of 14,327 in the U.S. and the 881st largest of 1,358 wind plants. By 2025 generation it is the 78th largest of 129 generating plants in the state.

Linden Wind Energy Project within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)5031,7120.2%
Generation (MWh)104,333101,512,8620.1%
Wind capacity (MW)503,3871.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Linden Wind Energy Project plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 15 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
LW1OperatingOnshore Wind Turbine502010n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Linden Wind Energy Project plant?

Southern California P P A is the only joint owner reported for Linden Wind Energy Project, with 100.0%. Los Angeles Department of Water & Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Los Angeles Department of Water & Power charge homes?

Los Angeles Department of Water & Power, the operator of Linden Wind Energy Project, had an average residential price of 26.48¢ per kWh and an average bill of $124 a month in 2025 in California.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
Los Angeles Department of Water & Power26.48¢$124other state
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Linden Wind Energy Project plant?

Linden Wind Energy Project is in Goldendale, Klickitat County, Washington, at 45.7442° N, 120.7836° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Washington are similar in size?

Washington has 23 operable wind plants with 3,387 MW of capacity, and Linden Wind Energy Project's 50 MW is 1% of that.

Wind plants in Washington around this size
PlantCountyMW2025 MWh
Nine CanyonBenton96185,765
Vantage Wind Energy LLCKittitas90253,206
Big Horn Wind IIKlickitat50105,137
Linden Wind Energy ProjectKlickitat50104,333

Source: EIA Forms EIA-860 and EIA-923, 2025.