Big Juniper Solar power plant, Florida

Big Juniper Solar is a 74.5 MW solar power plant in Santa Rosa County, Florida, operated by Florida Power & Light Co, and it generated 166,502 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 68th percentile of U.S. solar plants. By 2025 generation it ranks 2,748th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
26%Capacity factor, 2025, 68th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
1 yearAverage generator age, by MW

How hard does the Big Juniper Solar plant run compared with other solar plants?

The Big Juniper Solar plant had a capacity factor of 26% in 2025 on 74.5 MW of net summer capacity, the 68th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Big Juniper Solar26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Big Juniper Solar plant generating more or less than last year?

Big Juniper Solar generated 166,502 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.2% behind the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024108,573
2025166,502
2026 through August110,790
2025, same months114,453
Monthly generation, Mar 2024 to Aug 2026
MonthMWh
August 202615,391
July 202617,486
June 202614,850
May 202613,710
April 202615,601
March 202614,236
February 202610,396
January 20269,120
December 20257,744
November 202513,745
October 202513,308
September 202517,252
August 202514,057
July 202517,194
June 202515,107
May 202517,838
April 202516,422
March 202514,663
February 202510,676
January 20258,496
December 20249,710
November 20248,025
October 202410,596
September 20249,620
August 202415,131
July 202413,323
June 202415,793
May 202414,638
April 202411,737
March 20240

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Big Juniper Solar plant?

Big Juniper Solar made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 698th largest of 7,223 solar plants. By 2025 generation it is the 119th largest of 313 generating plants in the state.

Big Juniper Solar within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)166,502267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Big Juniper Solar plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Big Juniper Solar plant?

EIA lists no joint owners for Big Juniper Solar. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Big Juniper Solar, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Big Juniper Solar plant?

Big Juniper Solar is in TBD, Santa Rosa County, Florida, at 30.6393° N, 86.9256° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Big Juniper Solar's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
FPL Saw Palmetto Solar Energy CenterBay75178,099
FPL Cypress Pond SolarWashington75170,832
FPL Etonia CreekPutnam75154,439
Big Juniper SolarSanta Rosa75166,502
Three CreeksManatee75174,861
SambucusManatee75168,426
PineappleSt Lucie75150,060