Solar power plant, Florida
FPL Cypress Pond Solar power plant, Florida
FPL Cypress Pond Solar is a 74.5 MW solar power plant in Washington County, Florida, operated by Florida Power & Light Co, and it generated 170,832 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 72nd percentile of U.S. solar plants. By 2025 generation it ranks 2,714th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the FPL Cypress Pond Solar plant run compared with other solar plants?
The FPL Cypress Pond Solar plant had a capacity factor of 26% in 2025 on 74.5 MW of net summer capacity, the 72nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| FPL Cypress Pond Solar | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the FPL Cypress Pond Solar plant generating more or less than last year?
Generation at FPL Cypress Pond Solar rose 4.2% from 2024 to 2025, from 163,968 MWh to 170,832 MWh. Through August 2026 it is running 4.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 163,968 |
| 2025 | 170,832 |
| 2026 through August | 122,821 |
| 2025, same months | 117,760 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 16,453 |
| July 2026 | 18,986 |
| June 2026 | 16,566 |
| May 2026 | 15,282 |
| April 2026 | 16,384 |
| March 2026 | 16,702 |
| February 2026 | 11,364 |
| January 2026 | 11,084 |
| December 2025 | 9,162 |
| November 2025 | 12,709 |
| October 2025 | 14,203 |
| September 2025 | 16,998 |
| August 2025 | 13,789 |
| July 2025 | 17,173 |
| June 2025 | 16,075 |
| May 2025 | 17,658 |
| April 2025 | 17,463 |
| March 2025 | 15,270 |
| February 2025 | 11,076 |
| January 2025 | 9,256 |
| December 2024 | 10,101 |
| November 2024 | 8,287 |
| October 2024 | 14,319 |
| September 2024 | 10,856 |
| August 2024 | 18,562 |
| July 2024 | 16,917 |
| June 2024 | 17,397 |
| May 2024 | 17,089 |
| April 2024 | 16,380 |
| March 2024 | 13,741 |
| February 2024 | 11,037 |
| January 2024 | 9,282 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the FPL Cypress Pond Solar plant, and when do they retire?
1 operable generator totals 74.5 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 75 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Solar Photovoltaic | 75 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the FPL Cypress Pond Solar plant?
EIA lists no joint owners for FPL Cypress Pond Solar. Florida Power & Light Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Florida Power & Light Co charge homes?
Florida Power & Light Co, the operator of FPL Cypress Pond Solar, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.
| Measure | Price | Monthly bill | Against Florida |
|---|---|---|---|
| Florida Power & Light Co | 14.62¢ | $162 | 4% lower |
| Florida average | 15.21¢ | $168 | |
| U.S. average | 17.23¢ | $151 | 13% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the FPL Cypress Pond Solar plant?
FPL Cypress Pond Solar is in Vernon, Washington County, Florida, at 30.4213° N, 85.4410° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Florida are similar in size?
Florida has 210 operable solar plants with 12,223 MW of capacity, and FPL Cypress Pond Solar's 74.5 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| FPL Cavendish Solar Energy Center | Okeechobee | 75 | 116,139 |
| Bell Ridge Solar | Gilchrist | 75 | 195,660 |
| FPL Saw Palmetto Solar Energy Center | Bay | 75 | 178,099 |
| FPL Cypress Pond Solar | Washington | 75 | 170,832 |
| FPL Etonia Creek | Putnam | 75 | 154,439 |
| Big Juniper Solar | Santa Rosa | 75 | 166,502 |
| Three Creeks | Manatee | 75 | 174,861 |
Source: EIA Forms EIA-860 and EIA-923, 2025.