Solar power plant, Florida
Bell Ridge Solar power plant, Florida
Bell Ridge Solar is a 74.5 MW solar power plant in Gilchrist County, Florida, operated by Bell Ridge Solar, LLC, and it generated 195,660 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 90th percentile of U.S. solar plants. By 2025 generation it ranks 2,528th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Bell Ridge Solar plant run compared with other solar plants?
The Bell Ridge Solar plant had a capacity factor of 30% in 2025 on 74.5 MW of net summer capacity, the 90th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 109 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Bell Ridge Solar | 30% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Bell Ridge Solar plant generating more or less than last year?
Generation at Bell Ridge Solar rose 3.2% from 2024 to 2025, from 189,510 MWh to 195,660 MWh. Through August 2026 it is running 6.9% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 189,510 |
| 2025 | 195,660 |
| 2026 through August | 128,841 |
| 2025, same months | 138,448 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 16,590 |
| July 2026 | 17,573 |
| June 2026 | 17,648 |
| May 2026 | 17,072 |
| April 2026 | 18,754 |
| March 2026 | 16,137 |
| February 2026 | 13,338 |
| January 2026 | 11,729 |
| December 2025 | 10,254 |
| November 2025 | 14,499 |
| October 2025 | 15,322 |
| September 2025 | 17,137 |
| August 2025 | 17,318 |
| July 2025 | 18,236 |
| June 2025 | 17,941 |
| May 2025 | 19,999 |
| April 2025 | 21,074 |
| March 2025 | 17,796 |
| February 2025 | 12,713 |
| January 2025 | 13,371 |
| December 2024 | 11,387 |
| November 2024 | 13,022 |
| October 2024 | 16,070 |
| September 2024 | 13,200 |
| August 2024 | 17,896 |
| July 2024 | 18,165 |
| June 2024 | 19,455 |
| May 2024 | 19,889 |
| April 2024 | 19,769 |
| March 2024 | 15,550 |
| February 2024 | 14,012 |
| January 2024 | 11,095 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Bell Ridge Solar plant, and when do they retire?
1 operable generator totals 74.5 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 75 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BRS | Operating | Solar Photovoltaic | 75 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Bell Ridge Solar plant?
EIA lists no joint owners for Bell Ridge Solar. Bell Ridge Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Bell Ridge Solar plant?
Bell Ridge Solar is in Trenton, Gilchrist County, Florida, at 29.7187° N, 82.7108° W. It sits in the Seminole Electric Cooperative balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Florida are similar in size?
Florida has 210 operable solar plants with 12,223 MW of capacity, and Bell Ridge Solar's 74.5 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Apalachee | Jackson | 75 | 143,666 |
| Blackwater River Solar Energy Center | Santa Rosa | 75 | 141,274 |
| FPL Cavendish Solar Energy Center | Okeechobee | 75 | 116,139 |
| Bell Ridge Solar | Gilchrist | 75 | 195,660 |
| FPL Saw Palmetto Solar Energy Center | Bay | 75 | 178,099 |
| FPL Cypress Pond Solar | Washington | 75 | 170,832 |
| FPL Etonia Creek | Putnam | 75 | 154,439 |
Source: EIA Forms EIA-860 and EIA-923, 2025.