Blackwater River Solar Energy Center is a 149 MW power plant, 74.5 MW of it solar, in Santa Rosa County, Florida, operated by Florida Power & Light Co, and it generated 141,156 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 38th percentile of U.S. solar plants. By 2025 generation it ranks 3,000th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

149 MWNameplate capacity
22%Capacity factor, 2025, solar units, 38th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
1 yearAverage generator age, by MW

How hard does the Blackwater River Solar Energy Center plant run compared with other solar plants?

The Blackwater River Solar Energy Center plant's solar units had a capacity factor of 22% in 2025 on 74.5 MW of net summer capacity, the 38th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 79 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blackwater River Solar Energy Center22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Blackwater River Solar Energy Center plant generating more or less than last year?

Generation at Blackwater River Solar Energy Center fell 0.8% from 2024 to 2025, from 142,223 MWh to 141,156 MWh. Through August 2026 it is running 4.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024142,223
2025141,156
2026 through August91,040
2025, same months95,333
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,261
July 202614,273
June 202611,617
May 202611,329
April 202612,159
March 202611,887
February 20268,855
January 20268,659
December 20258,555
November 202510,808
October 202511,767
September 202514,693
August 202512,816
July 202514,843
June 202513,170
May 202514,598
April 202512,997
March 20258,839
February 20259,915
January 20258,155
December 20249,885
November 20249,189
October 202414,287
September 202410,195
August 202415,234
July 202412,115
June 202413,448
May 202414,239
April 202413,109
March 202411,453
February 20249,459
January 20249,610

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Blackwater River Solar Energy Center plant?

Blackwater River Solar Energy Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.2% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 53rd largest of 331 plants in Florida, the 2,071st largest of 14,327 in the U.S. and the 692nd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 178th largest of 313 generating plants in the state.

Blackwater River Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)14979,9360.2%
Generation (MWh)141,156267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blackwater River Solar Energy Center plant, and when do they retire?

2 operable generators total 149 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2149100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752023n/a
2OperatingBatteries752025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blackwater River Solar Energy Center plant?

EIA lists no joint owners for Blackwater River Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Blackwater River Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Blackwater River Solar Energy Center plant use?

Blackwater River Solar Energy Center has capacity on 2 fuels: 50% solar and 50% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar7550.0%141,274
Battery and pumped storage7550.0%-118

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Blackwater River Solar Energy Center plant?

Blackwater River Solar Energy Center is in Milton, Santa Rosa County, Florida, at 30.6469° N, 86.9382° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Blackwater River Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Wild Azalea Solar Energy CenterGadsden75173,333
Anhinga Solar Energy CenterClay75128,847
ApalacheeJackson75143,666
Blackwater River Solar Energy CenterSanta Rosa75141,274
FPL Cavendish Solar Energy CenterOkeechobee75116,139
Bell Ridge SolarGilchrist75195,660
FPL Saw Palmetto Solar Energy CenterBay75178,099