Wild Azalea Solar Energy Center, Florida

Wild Azalea Solar Energy Center is a 74.5 MW solar power plant in Gadsden County, Florida, operated by Florida Power & Light Co, and it generated 173,333 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 75th percentile of U.S. solar plants. By 2025 generation it ranks 2,690th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
27%Capacity factor, 2025, 75th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
2 yearsAverage generator age, by MW

How hard does the Wild Azalea Solar Energy Center plant run compared with other solar plants?

The Wild Azalea Solar Energy Center plant had a capacity factor of 27% in 2025 on 74.5 MW of net summer capacity, the 75th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Wild Azalea Solar Energy Center27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Wild Azalea Solar Energy Center plant generating more or less than last year?

Generation at Wild Azalea Solar Energy Center rose 1.9% from 2024 to 2025, from 170,058 MWh to 173,333 MWh. Through August 2026 it is running 0.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024170,058
2025173,333
2026 through August121,768
2025, same months121,613
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202617,150
July 202616,919
June 202616,439
May 202615,252
April 202617,290
March 202616,572
February 202611,829
January 202610,317
December 20258,406
November 202512,419
October 202513,586
September 202517,309
August 202514,392
July 202516,913
June 202516,166
May 202518,277
April 202518,773
March 202516,380
February 202510,729
January 20259,983
December 202410,255
November 20249,480
October 202415,710
September 202410,679
August 202417,820
July 202416,584
June 202418,045
May 202417,026
April 202417,287
March 202414,490
February 202411,965
January 202410,717

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Wild Azalea Solar Energy Center plant?

Wild Azalea Solar Energy Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 689th largest of 7,223 solar plants. By 2025 generation it is the 107th largest of 313 generating plants in the state.

Wild Azalea Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)173,333267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Wild Azalea Solar Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Wild Azalea Solar Energy Center plant?

EIA lists no joint owners for Wild Azalea Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Wild Azalea Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Wild Azalea Solar Energy Center plant?

Wild Azalea Solar Energy Center is in Chattahoochee, Gadsden County, Florida, at 30.6758° N, 84.7403° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Wild Azalea Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
FPL Flowers Creek Solar Energy CenterCalhoun75137,900
Pink Trial Solar Energy CenterSt Lucie75147,447
FPL Shirer Branch Solar Energy CenterCalhoun75185,167
Wild Azalea Solar Energy CenterGadsden75173,333
Anhinga Solar Energy CenterClay75128,847
ApalacheeJackson75143,666
Blackwater River Solar Energy CenterSanta Rosa75141,274

Source: EIA Forms EIA-860 and EIA-923, 2025.