FPL Flowers Creek Solar Energy Center, Florida

FPL Flowers Creek Solar Energy Center is a 74.5 MW solar power plant in Calhoun County, Florida, operated by Florida Power & Light Co, and it generated 137,900 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 33rd percentile of U.S. solar plants. By 2025 generation it ranks 3,028th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
21%Capacity factor, 2025, 33rd percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
2 yearsAverage generator age, by MW

How hard does the FPL Flowers Creek Solar Energy Center plant run compared with other solar plants?

The FPL Flowers Creek Solar Energy Center plant had a capacity factor of 21% in 2025 on 74.5 MW of net summer capacity, the 33rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 77 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
FPL Flowers Creek Solar Energy Center21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the FPL Flowers Creek Solar Energy Center plant generating more or less than last year?

Generation at FPL Flowers Creek Solar Energy Center rose 12.9% from 2024 to 2025, from 122,092 MWh to 137,900 MWh. Through August 2026 it is running 4.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024122,092
2025137,900
2026 through August100,139
2025, same months96,148
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,962
July 202615,422
June 202613,991
May 202612,359
April 202614,092
March 202612,884
February 20269,584
January 20267,845
December 20256,788
November 20259,697
October 202510,801
September 202514,466
August 202511,964
July 202514,022
June 202513,943
May 202514,879
April 202514,611
March 20259,455
February 20258,364
January 20258,910
December 20248,104
November 20247,451
October 202411,642
September 20248,705
August 202413,438
July 202411,982
June 202412,843
May 202412,523
April 202412,405
March 20249,758
February 20247,194
January 20246,047

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the FPL Flowers Creek Solar Energy Center plant?

FPL Flowers Creek Solar Energy Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 686th largest of 7,223 solar plants. By 2025 generation it is the 183rd largest of 313 generating plants in the state.

FPL Flowers Creek Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)137,900267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the FPL Flowers Creek Solar Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the FPL Flowers Creek Solar Energy Center plant?

EIA lists no joint owners for FPL Flowers Creek Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of FPL Flowers Creek Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the FPL Flowers Creek Solar Energy Center plant?

FPL Flowers Creek Solar Energy Center is in Altha, Calhoun County, Florida, at 30.5700° N, 85.0402° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and FPL Flowers Creek Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
FPL Chipola River Solar Energy CenterCalhoun75154,592
Everglades Solar Energy CenterMiami Dade75144,968
First City Solar Energy CenterEscambia75127,746
FPL Flowers Creek Solar Energy CenterCalhoun75137,900
Pink Trial Solar Energy CenterSt Lucie75147,447
FPL Shirer Branch Solar Energy CenterCalhoun75185,167
Wild Azalea Solar Energy CenterGadsden75173,333