Skip to main content
RateWatt

Solar power plant, Florida

Pink Trial Solar Energy Center, Florida

Pink Trial Solar Energy Center is a 74.5 MW solar power plant in St Lucie County, Florida, operated by Florida Power & Light Co, and it generated 147,447 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 46th percentile of U.S. solar plants. By 2025 generation it ranks 2,926th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
23%Capacity factor, 2025, 46th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
2 yearsAverage generator age, by MW

How hard does the Pink Trial Solar Energy Center plant run compared with other solar plants?

The Pink Trial Solar Energy Center plant had a capacity factor of 23% in 2025 on 74.5 MW of net summer capacity, the 46th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pink Trial Solar Energy Center23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pink Trial Solar Energy Center plant generating more or less than last year?

Generation at Pink Trial Solar Energy Center fell 2.0% from 2024 to 2025, from 150,530 MWh to 147,447 MWh. Through August 2026 it is running 4.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024150,530
2025147,447
2026 through August97,769
2025, same months102,340
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,444
July 202613,305
June 202612,695
May 202612,532
April 202613,339
March 202612,716
February 202611,091
January 20269,647
December 202510,917
November 202511,218
October 202511,836
September 202511,136
August 202512,957
July 202512,767
June 202512,365
May 202513,382
April 202514,501
March 202514,930
February 202511,552
January 20259,886
December 202410,834
November 202410,605
October 202411,129
September 202412,166
August 202412,663
July 202413,396
June 202413,120
May 202415,590
April 202416,140
March 202413,511
February 202412,576
January 20248,800

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Pink Trial Solar Energy Center plant?

Pink Trial Solar Energy Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 687th largest of 7,223 solar plants. By 2025 generation it is the 163rd largest of 313 generating plants in the state.

Pink Trial Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)147,447267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pink Trial Solar Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pink Trial Solar Energy Center plant?

EIA lists no joint owners for Pink Trial Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Pink Trial Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Pink Trial Solar Energy Center plant?

Pink Trial Solar Energy Center is in Port St. Lucie, St Lucie County, Florida, at 27.2978° N, 80.5421° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Pink Trial Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Everglades Solar Energy CenterMiami Dade75144,968
First City Solar Energy CenterEscambia75127,746
FPL Flowers Creek Solar Energy CenterCalhoun75137,900
Pink Trial Solar Energy CenterSt Lucie75147,447
FPL Shirer Branch Solar Energy CenterCalhoun75185,167
Wild Azalea Solar Energy CenterGadsden75173,333
Anhinga Solar Energy CenterClay75128,847

Source: EIA Forms EIA-860 and EIA-923, 2025.