Skip to main content
RateWatt

Solar power plant, Florida

Apalachee solar power plant, Florida

Apalachee is a 74.5 MW solar power plant in Jackson County, Florida, operated by Florida Power & Light Co, and it generated 143,666 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 41st percentile of U.S. solar plants. By 2025 generation it ranks 2,973rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
22%Capacity factor, 2025, 41st percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
2 yearsAverage generator age, by MW

How hard does the Apalachee plant run compared with other solar plants?

The Apalachee plant had a capacity factor of 22% in 2025 on 74.5 MW of net summer capacity, the 41st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 80 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Apalachee22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Apalachee plant generating more or less than last year?

Generation at Apalachee rose 1.5% from 2024 to 2025, from 141,526 MWh to 143,666 MWh. Through August 2026 it is running 5.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024141,526
2025143,666
2026 through August106,986
2025, same months101,076
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202615,966
July 202617,096
June 202615,580
May 202613,454
April 202615,078
March 202612,911
February 20268,847
January 20268,054
December 20257,296
November 20259,705
October 202510,875
September 202514,714
August 202512,777
July 202515,316
June 202514,900
May 202516,206
April 202515,414
March 20259,854
February 20258,502
January 20258,107
December 20247,993
November 20247,579
October 202412,465
September 20249,280
August 202416,083
July 202413,842
June 202414,787
May 202415,715
April 202414,964
March 202411,254
February 20249,313
January 20248,251

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Apalachee plant?

Apalachee made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 691st largest of 7,223 solar plants. By 2025 generation it is the 173rd largest of 313 generating plants in the state.

Apalachee within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)143,666267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Apalachee plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Apalachee plant?

EIA lists no joint owners for Apalachee. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Apalachee, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Apalachee plant?

Apalachee is in Marianna, Jackson County, Florida, at 30.7605° N, 85.0695° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Apalachee's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
FPL Shirer Branch Solar Energy CenterCalhoun75185,167
Wild Azalea Solar Energy CenterGadsden75173,333
Anhinga Solar Energy CenterClay75128,847
ApalacheeJackson75143,666
Blackwater River Solar Energy CenterSanta Rosa75141,274
FPL Cavendish Solar Energy CenterOkeechobee75116,139
Bell Ridge SolarGilchrist75195,660

Source: EIA Forms EIA-860 and EIA-923, 2025.