Big Sandy Peaker Plant is a 353 MW natural gas power plant in Wayne County, West Virginia, operated by Middle River Power II, LLC, and it generated 329,839 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in West Virginia, and its capacity factor sits at the 39th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,848th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

353 MWNameplate capacity
13%Capacity factor, 2025, 39th percentile, on 300 MW net summer
0.6%Of WV generation, 2025
24 yearsAverage generator age, by MW

How hard does Big Sandy Peaker Plant run compared with other natural gas plants?

Big Sandy Peaker Plant had a capacity factor of 13% in 2025 on 300 MW of net summer capacity, the 39th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 46 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Big Sandy Peaker Plant13%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Big Sandy Peaker Plant generating more or less than last year?

Generation at Big Sandy Peaker Plant rose 15.6% from 2024 to 2025, from 285,310 MWh to 329,839 MWh.

Net generation by period
PeriodMWh
2024285,310
2025329,839
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20256,709
November 202521,411
October 202534,061
September 202541,262
August 202526,018
July 202542,442
June 202545,129
May 202530,648
April 202533,953
March 202528,065
February 202515,752
January 20254,389
December 202410,198
November 202419,137
October 202423,795
September 202432,249
August 202415,429
July 202419,637
June 202411,646
May 202431,080
April 202446,766
March 202438,263
February 202422,730
January 202414,379

Source: EIA Form EIA-923, through August 2026.

How much of West Virginia's electricity comes from Big Sandy Peaker Plant?

Big Sandy Peaker Plant made 0.6% of the 53,389,456 MWh reported by West Virginia plants in 2025, from 2.2% of the state's 16,061 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 11th largest of 42 plants in West Virginia, the 915th largest of 14,327 in the U.S. and the 555th largest of 1,962 natural gas plants. By 2025 generation it is the 16th largest of 40 generating plants in the state.

Big Sandy Peaker Plant within West Virginia, 2025
MeasureThis plantWest VirginiaShare
Capacity (MW)35316,0612.2%
Generation (MWh)329,83953,389,4560.6%
Natural gas capacity (MW)3531,37125.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Big Sandy Peaker Plant, and when do they retire?

6 operable generators total 353 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s6353100%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BSG1OperatingNatural Gas Fired Combustion Turbine592001n/a
BSG2OperatingNatural Gas Fired Combustion Turbine592001n/a
BSG3OperatingNatural Gas Fired Combustion Turbine592001n/a
BSG4OperatingNatural Gas Fired Combustion Turbine592001n/a
BSG5OperatingNatural Gas Fired Combustion Turbine592001n/a
BSG6OperatingNatural Gas Fired Combustion Turbine592001n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Big Sandy Peaker Plant?

EIA lists no joint owners for Big Sandy Peaker Plant. Middle River Power II, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Big Sandy Peaker Plant?

Big Sandy Peaker Plant is in Kenona, Wayne County, West Virginia, at 38.3441° N, 82.5938° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in West Virginia are similar in size?

West Virginia has 4 operable natural gas plants with 1,371 MW of capacity, and Big Sandy Peaker Plant's 353 MW is 26% of that.

Natural gas plants in West Virginia around this size
PlantCountyMW2025 MWh
Ceredo Generating StationWayne519702,143
Pleasants Energy LLCPleasants3831,538,323
Big Sandy Peaker PlantWayne353329,839