Natural gas power plant, West Virginia

Ceredo Generating Station, West Virginia

Ceredo Generating Station is a 519 MW natural gas power plant in Wayne County, West Virginia, operated by Appalachian Power Co, and it generated 702,143 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.3% of the generation reported in West Virginia, and its capacity factor sits at the 46th percentile of U.S. natural gas plants. By 2025 generation it ranks 987th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

519 MWNameplate capacity
18%Capacity factor, 2025, 46th percentile, on 450 MW net summer
1.3%Of WV generation, 2025
24 yearsAverage generator age, by MW

How hard does Ceredo Generating Station run compared with other natural gas plants?

Ceredo Generating Station had a capacity factor of 18% in 2025 on 450 MW of net summer capacity, the 46th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 65 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Ceredo Generating Station18%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Ceredo Generating Station generating more or less than last year?

Generation at Ceredo Generating Station rose 42.6% from 2024 to 2025, from 492,386 MWh to 702,143 MWh. Through August 2026 it is running 46.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024492,386
2025702,143
2026 through August599,529
2025, same months409,579
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026121,959
July 202654,648
June 202619,297
May 20262,137
April 2026141,375
March 202670,970
February 2026114,848
January 202674,295
December 202550,336
November 202563,824
October 2025135,612
September 202542,792
August 202569,099
July 2025101,277
June 202544,978
May 202510,968
April 202535,481
March 202532,267
February 202550,304
January 202565,205
December 202431,564
November 2024148,599
October 202474,199
September 202445,969
August 202426,497
July 202452,789
June 202445,230
May 202420,534
April 202411,787
March 202410,631
February 20247,042
January 202417,545

Source: EIA Form EIA-923, through August 2026.

How much of West Virginia's electricity comes from Ceredo Generating Station?

Ceredo Generating Station made 1.3% of the 53,389,456 MWh reported by West Virginia plants in 2025, from 3.2% of the state's 16,061 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 9th largest of 42 plants in West Virginia, the 715th largest of 14,327 in the U.S. and the 449th largest of 1,962 natural gas plants. By 2025 generation it is the 9th largest of 40 generating plants in the state.

Ceredo Generating Station within West Virginia, 2025
MeasureThis plantWest VirginiaShare
Capacity (MW)51916,0613.2%
Generation (MWh)702,14353,389,4561.3%
Natural gas capacity (MW)5191,37137.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Ceredo Generating Station, and when do they retire?

6 operable generators total 519 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s6519100%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
01OperatingNatural Gas Fired Combustion Turbine872001n/a
02OperatingNatural Gas Fired Combustion Turbine872001n/a
03OperatingNatural Gas Fired Combustion Turbine872001n/a
04OperatingNatural Gas Fired Combustion Turbine872001n/a
05OperatingNatural Gas Fired Combustion Turbine872001n/a
06OperatingNatural Gas Fired Combustion Turbine872001n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Ceredo Generating Station?

EIA lists no joint owners for Ceredo Generating Station. Appalachian Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Appalachian Power Co charge homes?

Appalachian Power Co, the operator of Ceredo Generating Station, had an average residential price of 16.97¢ per kWh and an average bill of $196 a month in 2025, 10% above the West Virginia average of 15.39¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst West Virginia
Appalachian Power Co16.97¢$19610% higher
West Virginia average15.39¢$165
U.S. average17.23¢$15112% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Ceredo Generating Station?

Ceredo Generating Station is in Huntington, Wayne County, West Virginia, at 38.3681° N, 82.5339° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in West Virginia are similar in size?

West Virginia has 4 operable natural gas plants with 1,371 MW of capacity, and Ceredo Generating Station's 519 MW is 38% of that.

Natural gas plants in West Virginia around this size
PlantCountyMW2025 MWh
Ceredo Generating StationWayne519702,143
Pleasants Energy LLCPleasants3831,538,323
Big Sandy Peaker PlantWayne353329,839