Wind power plant, Maine
Bingham Wind power plant, Maine
Bingham Wind is a 186 MW wind power plant in Piscataquis County, Maine, operated by Onward Energy, and it generated 498,779 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.4% of the generation reported in Maine, and its capacity factor sits at the 42nd percentile of U.S. wind plants. By 2025 generation it ranks 1,342nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Bingham Wind plant run compared with other wind plants?
The Bingham Wind plant had a capacity factor of 31% in 2025 on 186 MW of net summer capacity, the 42nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 112 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Bingham Wind | 31% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Bingham Wind plant generating more or less than last year?
Generation at Bingham Wind rose 11.3% from 2024 to 2025, from 448,219 MWh to 498,779 MWh. Through August 2026 it is running 4.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 448,219 |
| 2025 | 498,779 |
| 2026 through August | 307,136 |
| 2025, same months | 322,249 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 25,879 |
| July 2026 | 30,347 |
| June 2026 | 23,624 |
| May 2026 | 39,444 |
| April 2026 | 35,891 |
| March 2026 | 43,403 |
| February 2026 | 51,876 |
| January 2026 | 56,672 |
| December 2025 | 61,115 |
| November 2025 | 55,419 |
| October 2025 | 39,111 |
| September 2025 | 20,885 |
| August 2025 | 17,649 |
| July 2025 | 24,714 |
| June 2025 | 28,157 |
| May 2025 | 30,350 |
| April 2025 | 41,974 |
| March 2025 | 53,096 |
| February 2025 | 57,902 |
| January 2025 | 68,407 |
| December 2024 | 32,680 |
| November 2024 | 65,880 |
| October 2024 | 47,336 |
| September 2024 | 19,915 |
| August 2024 | 22,972 |
| July 2024 | 20,059 |
| June 2024 | 27,880 |
| May 2024 | 19,476 |
| April 2024 | 49,788 |
| March 2024 | 53,009 |
| February 2024 | 48,199 |
| January 2024 | 41,025 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Bingham Wind plant, and when do they retire?
1 operable generator totals 186 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 186 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 186 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Bingham Wind plant?
EIA lists no joint owners for Bingham Wind. Onward Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Bingham Wind plant?
Bingham Wind is in Bingham, Piscataquis County, Maine, at 45.1033° N, 69.7619° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Maine are similar in size?
Maine has 22 operable wind plants with 1,217 MW of capacity, and Bingham Wind's 186 MW is 15% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Bingham Wind | Piscataquis | 186 | 498,779 |
| Oakfield Wind Project | Aroostook | 148 | 350,648 |
| Kibby Wind Facility | Franklin | 132 | 261,626 |
| Downeast Wind | Washington | 126 | 264,185 |
Source: EIA Forms EIA-860 and EIA-923, 2025.