Downeast Wind is a 126 MW wind power plant in Washington County, Maine, operated by Downeast Wind, LLC, and it generated 264,185 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.8% of the generation reported in Maine, and its capacity factor sits at the 18th percentile of U.S. wind plants. By 2025 generation it ranks 2,139th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Downeast Wind plant run compared with other wind plants?
The Downeast Wind plant had a capacity factor of 24% in 2025 on 126 MW of net summer capacity, the 18th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 87 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Downeast Wind | 24% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Downeast Wind plant generating more or less than last year?
Downeast Wind generated 264,185 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 91.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 264,185 |
| 2026 through August | 239,537 |
| 2025, same months | 125,253 |
Monthly generation, Jan 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 19,309 |
| July 2026 | 26,395 |
| June 2026 | 21,065 |
| May 2026 | 31,460 |
| April 2026 | 30,224 |
| March 2026 | 32,636 |
| February 2026 | 38,972 |
| January 2026 | 39,476 |
| December 2025 | 43,636 |
| November 2025 | 38,217 |
| October 2025 | 37,509 |
| September 2025 | 19,570 |
| August 2025 | 23,022 |
| July 2025 | 18,481 |
| June 2025 | 10,818 |
| May 2025 | 22,279 |
| April 2025 | 19,631 |
| March 2025 | 17,261 |
| February 2025 | 4,767 |
| January 2025 | 8,994 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Downeast Wind plant, and when do they retire?
1 operable generator totals 126 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 126 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| DOWNW | Operating | Onshore Wind Turbine | 126 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Downeast Wind plant?
EIA lists no joint owners for Downeast Wind. Downeast Wind, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Downeast Wind plant?
Downeast Wind is in Columbia, Washington County, Maine, at 44.7575° N, 67.9175° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Maine are similar in size?
Maine has 22 operable wind plants with 1,217 MW of capacity, and Downeast Wind's 126 MW is 10% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Bingham Wind | Piscataquis | 186 | 498,779 |
| Oakfield Wind Project | Aroostook | 148 | 350,648 |
| Kibby Wind Facility | Franklin | 132 | 261,626 |
| Downeast Wind | Washington | 126 | 264,185 |
| Weaver Wind | Hancock | 73 | 228,667 |
Source: EIA Forms EIA-860 and EIA-923, 2025.