Solar power plant, Georgia

Bird Dog Solar power plant, Georgia

Bird Dog Solar is a 40 MW solar power plant in Burke County, Georgia, operated by Bird Dog Solar, LLC, and it generated 97,088 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Georgia, and its capacity factor sits at the 81st percentile of U.S. solar plants. By 2025 generation it ranks 3,429th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

40 MWNameplate capacity
28%Capacity factor, 2025, 81st percentile, on 40 MW net summer
0.1%Of GA generation, 2025
2 yearsAverage generator age, by MW

How hard does the Bird Dog Solar plant run compared with other solar plants?

The Bird Dog Solar plant had a capacity factor of 28% in 2025 on 40 MW of net summer capacity, the 81st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 101 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Bird Dog Solar28%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Bird Dog Solar plant generating more or less than last year?

Generation at Bird Dog Solar rose 7.5% from 2024 to 2025, from 90,321 MWh to 97,088 MWh. Through August 2026 it is running 0.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202490,321
202597,088
2026 through August68,907
2025, same months68,363
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20268,930
July 202610,147
June 20269,236
May 20269,266
April 20269,840
March 20269,483
February 20266,316
January 20265,689
December 20255,059
November 20257,048
October 20257,181
September 20259,437
August 20258,089
July 202510,340
June 202510,254
May 20259,032
April 202510,065
March 20259,074
February 20255,560
January 20255,949
December 20244,563
November 20244,100
October 20244,081
September 20246,111
August 20249,782
July 20249,952
June 202411,480
May 20249,566
April 202410,382
March 20248,225
February 20246,571
January 20245,508

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Bird Dog Solar plant?

Bird Dog Solar made 0.1% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.1% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 103rd largest of 263 plants in Georgia, the 4,074th largest of 14,327 in the U.S. and the 973rd largest of 7,223 solar plants. By 2025 generation it is the 84th largest of 242 generating plants in the state.

Bird Dog Solar within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)4042,7190.1%
Generation (MWh)97,088144,967,3520.1%
Solar capacity (MW)405,4140.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Bird Dog Solar plant, and when do they retire?

1 operable generator totals 40 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s140100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GA-01OperatingSolar Photovoltaic402023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Bird Dog Solar plant?

EIA lists no joint owners for Bird Dog Solar. Bird Dog Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Bird Dog Solar plant?

Bird Dog Solar is in Waynesboro, Burke County, Georgia, at 33.1266° N, 81.9994° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and Bird Dog Solar's 40 MW is 1% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
Live Oak Solar, LLCCandler5184,464
Moody Air Force Base SolarLowndes5084,201
Hazlehurst IIIJeff Davis4073,196
Bird Dog SolarBurke4097,088
Sonny Solar LLCElbert4083,845
Wolfskin SolarOglethorpe3880,624
Marine Corps Logistics Base SolarDougherty3155,474

Source: EIA Forms EIA-860 and EIA-923, 2025.