Solar power plant, Georgia

Marine Corps Logistics Base Solar power plant, Georgia

Marine Corps Logistics Base Solar is a 31 MW solar power plant in Dougherty County, Georgia, operated by Georgia Power Co, and it generated 55,474 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 28th percentile of U.S. solar plants. By 2025 generation it ranks 3,961st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

31 MWNameplate capacity
20%Capacity factor, 2025, 28th percentile, on 31.2 MW net summer
3,961stU.S. rank by generation, 2025
7 yearsAverage generator age, by MW

How hard does the Marine Corps Logistics Base Solar plant run compared with other solar plants?

The Marine Corps Logistics Base Solar plant had a capacity factor of 20% in 2025 on 31.2 MW of net summer capacity, the 28th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 74 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Marine Corps Logistics Base Solar20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Marine Corps Logistics Base Solar plant generating more or less than last year?

Generation at Marine Corps Logistics Base Solar rose 3.2% from 2024 to 2025, from 53,729 MWh to 55,474 MWh. Through August 2026 it is running 1.3% behind the same months of 2025.

Net generation by period
PeriodMWh
202453,729
202555,474
2026 through August38,423
2025, same months38,921
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20264,928
July 20265,169
June 20265,031
May 20264,855
April 20265,629
March 20265,289
February 20263,912
January 20263,610
December 20252,966
November 20254,178
October 20254,165
September 20255,244
August 20254,479
July 20255,340
June 20255,336
May 20255,750
April 20255,751
March 20254,923
February 20253,785
January 20253,557
December 20243,208
November 20243,081
October 20244,900
September 20242,953
August 20245,836
July 20244,927
June 20245,469
May 20245,240
April 20245,337
March 20244,564
February 20244,199
January 20244,015

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Marine Corps Logistics Base Solar plant?

Marine Corps Logistics Base Solar made 0.0% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.1% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 107th largest of 263 plants in Georgia, the 4,330th largest of 14,327 in the U.S. and the 1,006th largest of 7,223 solar plants. By 2025 generation it is the 100th largest of 242 generating plants in the state.

Marine Corps Logistics Base Solar within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)3142,7190.1%
Generation (MWh)55,474144,967,3520.0%
Solar capacity (MW)315,4140.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Marine Corps Logistics Base Solar plant, and when do they retire?

1 operable generator totals 31 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s131100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic312018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Marine Corps Logistics Base Solar plant?

EIA lists no joint owners for Marine Corps Logistics Base Solar. Georgia Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Georgia Power Co charge homes?

Georgia Power Co, the operator of Marine Corps Logistics Base Solar, had an average residential price of 16.28¢ per kWh and an average bill of $161 a month in 2025, 10% above the Georgia average of 14.74¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Georgia
Georgia Power Co16.28¢$16110% higher
Georgia average14.74¢$159
U.S. average17.23¢$15117% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Marine Corps Logistics Base Solar plant?

Marine Corps Logistics Base Solar is in Albany, Dougherty County, Georgia, at 31.5607° N, 84.0933° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and Marine Corps Logistics Base Solar's 31 MW is 1% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
Bird Dog SolarBurke4097,088
Sonny Solar LLCElbert4083,845
Wolfskin SolarOglethorpe3880,624
Marine Corps Logistics Base SolarDougherty3155,474
Pawpaw Solar PlantTaylor3162,528
Simon Solar Farm LLCWalton3050,235
Fort Gordon Solar FacilityRichmond3051,422

Source: EIA Forms EIA-860 and EIA-923, 2025.