Blue Cypress Solar Energy Center, Florida

Blue Cypress Solar Energy Center is a 74.5 MW solar power plant in Indian River County, Florida, operated by Florida Power & Light Co, and it generated 131,311 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 26th percentile of U.S. solar plants. By 2025 generation it ranks 3,093rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
20%Capacity factor, 2025, 26th percentile, on 74.5 MW net summer
3,093rdU.S. rank by generation, 2025
7 yearsAverage generator age, by MW

How hard does the Blue Cypress Solar Energy Center plant run compared with other solar plants?

The Blue Cypress Solar Energy Center plant had a capacity factor of 20% in 2025 on 74.5 MW of net summer capacity, the 26th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 73 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blue Cypress Solar Energy Center20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Blue Cypress Solar Energy Center plant generating more or less than last year?

Generation at Blue Cypress Solar Energy Center fell 3.4% from 2024 to 2025, from 135,985 MWh to 131,311 MWh. Through August 2026 it is running 2.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024135,985
2025131,311
2026 through August91,772
2025, same months89,366
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202611,546
July 202612,136
June 202611,604
May 202612,362
April 202612,619
March 202612,350
February 20268,359
January 202610,796
December 202510,649
November 202511,198
October 202510,431
September 20259,667
August 202511,678
July 202511,200
June 202511,470
May 202512,039
April 202513,236
March 202511,996
February 20259,288
January 20258,459
December 20249,007
November 20249,236
October 20249,734
September 20249,989
August 202410,452
July 202410,918
June 202411,420
May 202415,180
April 202415,507
March 202414,163
February 202412,087
January 20248,292

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Blue Cypress Solar Energy Center plant?

Blue Cypress Solar Energy Center made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 632nd largest of 7,223 solar plants. By 2025 generation it is the 196th largest of 313 generating plants in the state.

Blue Cypress Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)131,311267,867,7350.0%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blue Cypress Solar Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blue Cypress Solar Energy Center plant?

EIA lists no joint owners for Blue Cypress Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Blue Cypress Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Blue Cypress Solar Energy Center plant?

Blue Cypress Solar Energy Center is in Vero Beach, Indian River County, Florida, at 27.6095° N, 80.5372° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Blue Cypress Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Horizon Solar Energy CenterPutnam75133,597
Coral Farms Solar Energy CenterPutnam75119,631
Hammock SolarHendry75142,745
Blue Cypress Solar Energy CenterIndian River75131,311
Wildflower Solar Energy CenterDesoto75141,420
Barefoot Bay Solar Energy CenterBrevard75135,812
Loggerhead Solar Energy CenterSt Lucie75128,017

Source: EIA Forms EIA-860 and EIA-923, 2025.