Coral Farms Solar Energy Center is a 74.5 MW solar power plant in Putnam County, Florida, operated by Florida Power & Light Co, and it generated 119,631 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 18th percentile of U.S. solar plants. By 2025 generation it ranks 3,200th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
18%Capacity factor, 2025, 18th percentile, on 74.5 MW net summer
3,200thU.S. rank by generation, 2025
7 yearsAverage generator age, by MW

How hard does the Coral Farms Solar Energy Center plant run compared with other solar plants?

The Coral Farms Solar Energy Center plant had a capacity factor of 18% in 2025 on 74.5 MW of net summer capacity, the 18th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 67 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Coral Farms Solar Energy Center18%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Coral Farms Solar Energy Center plant generating more or less than last year?

Generation at Coral Farms Solar Energy Center rose 9.8% from 2024 to 2025, from 108,984 MWh to 119,631 MWh. Through August 2026 it is running 16.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024108,984
2025119,631
2026 through August95,351
2025, same months81,701
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,236
July 202613,193
June 202613,683
May 202613,416
April 202613,062
March 202611,521
February 20269,296
January 20268,944
December 20257,839
November 20259,470
October 20259,797
September 202510,824
August 202510,895
July 202510,619
June 202511,026
May 202512,807
April 202512,361
March 20259,934
February 20257,411
January 20256,648
December 20245,024
November 20246,295
October 20247,799
September 20246,610
August 20249,224
July 20249,084
June 202410,563
May 202411,758
April 202412,906
March 202410,547
February 202410,793
January 20248,381

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Coral Farms Solar Energy Center plant?

Coral Farms Solar Energy Center made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 630th largest of 7,223 solar plants. By 2025 generation it is the 210th largest of 313 generating plants in the state.

Coral Farms Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)119,631267,867,7350.0%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Coral Farms Solar Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Coral Farms Solar Energy Center plant?

EIA lists no joint owners for Coral Farms Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Coral Farms Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Coral Farms Solar Energy Center plant?

Coral Farms Solar Energy Center is in Florahome, Putnam County, Florida, at 29.7569° N, 81.8972° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Coral Farms Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Citrus Solar Energy Center HybridDeSoto75138,010
Indian River Solar CenterIndian River75137,901
Horizon Solar Energy CenterPutnam75133,597
Coral Farms Solar Energy CenterPutnam75119,631
Hammock SolarHendry75142,745
Blue Cypress Solar Energy CenterIndian River75131,311
Wildflower Solar Energy CenterDesoto75141,420