Skip to main content
RateWatt

Solar power plant, Florida

Indian River Solar Center, Florida

Indian River Solar Center is a 74.5 MW solar power plant in Indian River County, Florida, operated by Florida Power & Light Co, and it generated 137,901 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 33rd percentile of U.S. solar plants. By 2025 generation it ranks 3,027th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
21%Capacity factor, 2025, 33rd percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
7 yearsAverage generator age, by MW

How hard does the Indian River Solar Center plant run compared with other solar plants?

The Indian River Solar Center plant had a capacity factor of 21% in 2025 on 74.5 MW of net summer capacity, the 33rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 77 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Indian River Solar Center21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Indian River Solar Center plant generating more or less than last year?

Generation at Indian River Solar Center fell 3.4% from 2024 to 2025, from 142,785 MWh to 137,901 MWh. Through August 2026 it is running 1.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024142,785
2025137,901
2026 through August95,419
2025, same months94,169
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202611,514
July 202612,164
June 202612,369
May 202613,453
April 202612,969
March 202612,340
February 202610,165
January 202610,445
December 202510,683
November 202511,648
October 202511,268
September 202510,133
August 202512,059
July 202512,119
June 202512,001
May 202512,764
April 202513,469
March 202512,656
February 202510,192
January 20258,909
December 20249,923
November 202410,128
October 202410,299
September 202410,771
August 202411,622
July 202412,838
June 202412,177
May 202414,926
April 202415,698
March 202413,494
February 202412,235
January 20248,674

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Indian River Solar Center plant?

Indian River Solar Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 628th largest of 7,223 solar plants. By 2025 generation it is the 182nd largest of 313 generating plants in the state.

Indian River Solar Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)137,901267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Indian River Solar Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Indian River Solar Center plant?

EIA lists no joint owners for Indian River Solar Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Indian River Solar Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Indian River Solar Center plant?

Indian River Solar Center is in Vero Beach, Indian River County, Florida, at 27.5733° N, 80.5782° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Indian River Solar Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Wimauma Solar and Battery StorageHillsborough75108,115
Babcock Solar Energy Center HybridCharlotte75134,873
Citrus Solar Energy Center HybridDeSoto75138,010
Indian River Solar CenterIndian River75137,901
Horizon Solar Energy CenterPutnam75133,597
Coral Farms Solar Energy CenterPutnam75119,631
Hammock SolarHendry75142,745

Source: EIA Forms EIA-860 and EIA-923, 2025.