Citrus Solar Energy Center Hybrid power plant, Florida

Citrus Solar Energy Center Hybrid is a 78.5 MW power plant, 74.5 MW of it solar, in DeSoto County, Florida, operated by Florida Power & Light Co, and it generated 137,818 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 34th percentile of U.S. solar plants. By 2025 generation it ranks 3,030th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

78.5 MWNameplate capacity
21%Capacity factor, 2025, solar units, 34th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
9 yearsAverage generator age, by MW

How hard does the Citrus Solar Energy Center Hybrid plant run compared with other solar plants?

The Citrus Solar Energy Center Hybrid plant's solar units had a capacity factor of 21% in 2025 on 74.5 MW of net summer capacity, the 34th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 77 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Citrus Solar Energy Center Hybrid21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Citrus Solar Energy Center Hybrid plant generating more or less than last year?

Generation at Citrus Solar Energy Center Hybrid rose 2.0% from 2024 to 2025, from 135,083 MWh to 137,818 MWh. Through August 2026 it is running 3.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024135,083
2025137,818
2026 through August91,925
2025, same months95,545
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,294
July 202612,334
June 202612,517
May 202612,592
April 202611,384
March 202611,733
February 20269,860
January 20269,211
December 202510,162
November 202510,333
October 202511,478
September 202510,300
August 202510,907
July 202511,909
June 202510,878
May 202512,787
April 202514,314
March 202515,137
February 202510,337
January 20259,276
December 20249,370
November 20249,393
October 202410,069
September 202410,710
August 202410,731
July 202411,979
June 202411,464
May 202413,270
April 202414,731
March 202412,841
February 202412,440
January 20248,085

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Citrus Solar Energy Center Hybrid plant?

Citrus Solar Energy Center Hybrid made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 80th largest of 331 plants in Florida, the 3,058th largest of 14,327 in the U.S. and the 627th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 185th largest of 313 generating plants in the state.

Citrus Solar Energy Center Hybrid within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7979,9360.1%
Generation (MWh)137,818267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Citrus Solar Energy Center Hybrid plant, and when do they retire?

2 operable generators total 78.5 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s279100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752016n/a
BAOperatingBatteries42018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Citrus Solar Energy Center Hybrid plant?

EIA lists no joint owners for Citrus Solar Energy Center Hybrid. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Citrus Solar Energy Center Hybrid, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Citrus Solar Energy Center Hybrid plant use?

Citrus Solar Energy Center Hybrid has capacity on 2 fuels: 95% solar and 5% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar7594.9%138,010
Battery and pumped storage45.1%-192

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Citrus Solar Energy Center Hybrid plant?

Citrus Solar Energy Center Hybrid is in Arcadia, DeSoto County, Florida, at 27.3209° N, 81.8069° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Citrus Solar Energy Center Hybrid's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Half Moon Solar PlantSumter7523,687
Wimauma Solar and Battery StorageHillsborough75108,115
Babcock Solar Energy Center HybridCharlotte75134,873
Citrus Solar Energy Center HybridDeSoto75138,010
Indian River Solar CenterIndian River75137,901
Horizon Solar Energy CenterPutnam75133,597
Coral Farms Solar Energy CenterPutnam75119,631

Source: EIA Forms EIA-860 and EIA-923, 2025.