Skip to main content
RateWatt

Hydro power plant, Colorado

Blue Mesa hydroelectric power plant, Colorado

Blue Mesa is a 86.4 MW hydro power plant in Gunnison County, Colorado, operated by U S Bureau of Reclamation, and it generated 198,014 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Colorado, and its capacity factor sits at the 33rd percentile of U.S. hydro plants. By 2025 generation it ranks 2,507th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

86.4 MWNameplate capacity
26%Capacity factor, 2025, 33rd percentile, on 86.4 MW net summer
0.4%Of CO generation, 2025
58 yearsAverage generator age, by MW

How hard does the Blue Mesa plant run compared with other hydro plants?

The Blue Mesa plant had a capacity factor of 26% in 2025 on 86.4 MW of net summer capacity, the 33rd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 95 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blue Mesa26%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Blue Mesa plant generating more or less than last year?

Generation at Blue Mesa fell 19.8% from 2024 to 2025, from 246,840 MWh to 198,014 MWh.

Net generation by period
PeriodMWh
2024246,840
2025198,014
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20254,661
November 20255,375
October 202517,203
September 202521,191
August 202523,016
July 202531,435
June 202525,168
May 202528,243
April 202514,226
March 20259,735
February 20259,018
January 20258,743
December 20246,773
November 20245,401
October 202422,306
September 202423,227
August 202428,632
July 202433,854
June 202432,254
May 202442,197
April 202421,969
March 202412,546
February 20248,417
January 20249,264

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Blue Mesa plant?

Blue Mesa made 0.4% of the 55,830,894 MWh reported by Colorado plants in 2025, from 0.4% of the state's 22,712 MW of capacity. By capacity it is the 65th largest of 321 plants in Colorado, the 2,894th largest of 14,327 in the U.S. and the 181st largest of 1,393 hydro plants. By 2025 generation it is the 52nd largest of 292 generating plants in the state.

Blue Mesa within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)8622,7120.4%
Generation (MWh)198,01455,830,8940.4%
Hydro capacity (MW)8667912.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blue Mesa plant, and when do they retire?

2 operable generators total 86.4 MW, with an average age of 58 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s286100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric431967n/a
2OperatingConventional Hydroelectric431967n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blue Mesa plant?

EIA lists no joint owners for Blue Mesa. U S Bureau of Reclamation operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Blue Mesa plant?

Blue Mesa is in Gunnison, Gunnison County, Colorado, at 38.4532° N, 107.3375° W. It sits in the Western Area Power Administration - Rocky Mountain Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Colorado are similar in size?

Colorado has 47 operable hydro plants with 679 MW of capacity, and Blue Mesa's 86.4 MW is 13% of that.

Hydro plants in Colorado around this size
PlantCountyMW2025 MWh
Blue MesaGunnison86198,014
FlatironLarimer86259,076
EstesLarimer45123,394

Source: EIA Forms EIA-860 and EIA-923, 2025.