Hydro power plant, Colorado
Flatiron hydroelectric power plant, Colorado
Flatiron is a 94.5 MW power plant, 86 MW of it hydro, in Larimer County, Colorado, operated by U S Bureau of Reclamation, and it generated 214,845 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Colorado, and its capacity factor sits at the 53rd percentile of U.S. hydro plants. By 2025 generation it ranks 2,391st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Flatiron plant run compared with other hydro plants?
The Flatiron plant's hydro units had a capacity factor of 34% in 2025 on 86 MW of net summer capacity, the 53rd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 126 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Flatiron | 34% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its hydro generators only. Values above 105% are left out of the comparison.
Is the Flatiron plant generating more or less than last year?
Generation at Flatiron rose 26.8% from 2024 to 2025, from 169,427 MWh to 214,845 MWh. Through August 2026 it is running 5.2% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 169,427 |
| 2025 | 214,845 |
| 2026 through August | 133,845 |
| 2025, same months | 141,204 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 20,888 |
| July 2026 | 20,396 |
| June 2026 | 19,078 |
| May 2026 | 21,712 |
| April 2026 | 2,550 |
| March 2026 | 5,371 |
| February 2026 | 21,430 |
| January 2026 | 22,420 |
| December 2025 | 23,102 |
| November 2025 | 19,533 |
| October 2025 | 7,481 |
| September 2025 | 23,525 |
| August 2025 | 22,453 |
| July 2025 | 19,154 |
| June 2025 | 24,911 |
| May 2025 | 16,458 |
| April 2025 | 549 |
| March 2025 | 16,203 |
| February 2025 | 20,329 |
| January 2025 | 21,147 |
| December 2024 | 24,109 |
| November 2024 | 9,544 |
| October 2024 | 4,419 |
| September 2024 | 19,450 |
| August 2024 | 18,165 |
| July 2024 | 21,331 |
| June 2024 | 21,730 |
| May 2024 | 23,805 |
| April 2024 | 21,729 |
| March 2024 | 4,665 |
| February 2024 | 246 |
| January 2024 | 234 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Flatiron plant, and when do they retire?
3 operable generators total 94.5 MW, with an average age of 71 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1950s | 3 | 95 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 43 | 1954 | n/a |
| 2 | Operating | Conventional Hydroelectric | 43 | 1954 | n/a |
| 3 | Operating | Hydroelectric Pumped Storage | 9 | 1954 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Flatiron plant?
EIA lists no joint owners for Flatiron. U S Bureau of Reclamation operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Flatiron plant use?
Flatiron has capacity on 2 fuels: 91% hydro and 9% battery and pumped storage. In 2025, hydro made 121% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Hydro | 86 | 91.0% | 259,076 |
| Battery and pumped storage | 9 | 9.0% | -44,231 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Flatiron plant?
Flatiron is in Loveland, Larimer County, Colorado, at 40.3650° N, 105.2360° W. It sits in the Western Area Power Administration - Rocky Mountain Region balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Colorado are similar in size?
Source: EIA Forms EIA-860 and EIA-923, 2025.