Skip to main content
RateWatt

Wind power plant, Texas

Blue Summit III Wind power plant, Texas

Blue Summit III Wind is a 200 MW wind power plant in Hardeman County, Texas, operated by Blue Summit III Wind, LLC, and it generated 748,038 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 84th percentile of U.S. wind plants. By 2025 generation it ranks 941st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
43%Capacity factor, 2025, 84th percentile, on 200 MW net summer
0.1%Of TX generation, 2025
6 yearsAverage generator age, by MW

How hard does the Blue Summit III Wind plant run compared with other wind plants?

The Blue Summit III Wind plant had a capacity factor of 43% in 2025 on 200 MW of net summer capacity, the 84th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 156 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blue Summit III Wind43%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Blue Summit III Wind plant generating more or less than last year?

Generation at Blue Summit III Wind rose 2.0% from 2024 to 2025, from 733,276 MWh to 748,038 MWh. Through August 2026 it is running 14.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024733,276
2025748,038
2026 through August581,280
2025, same months509,385
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202671,857
July 202663,609
June 202683,048
May 202667,513
April 202678,938
March 202684,090
February 202661,465
January 202670,760
December 202559,858
November 202575,785
October 202557,452
September 202545,558
August 202546,169
July 202553,600
June 202567,152
May 202556,950
April 202578,705
March 202582,758
February 202558,900
January 202565,151
December 202458,070
November 202467,764
October 202466,930
September 202439,083
August 202454,493
July 202457,784
June 202463,950
May 202465,386
April 202476,381
March 202466,079
February 202465,945
January 202451,411

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Blue Summit III Wind plant?

Blue Summit III Wind made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 297th largest of 1,023 plants in Texas, the 1,516th largest of 14,327 in the U.S. and the 267th largest of 1,358 wind plants. By 2025 generation it is the 173rd largest of 816 generating plants in the state.

Blue Summit III Wind within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)748,038592,896,1760.1%
Wind capacity (MW)20043,9420.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blue Summit III Wind plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BS3OperatingOnshore Wind Turbine2002019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blue Summit III Wind plant?

EIA lists no joint owners for Blue Summit III Wind. Blue Summit III Wind, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Blue Summit III Wind plant?

Blue Summit III Wind is in Chilicothe, Hardeman County, Texas, at 34.1705° N, 99.5634° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Blue Summit III Wind's 200 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Las Lomas Wind ProjectZapata202582,906
Stella Wind FarmKenedy201588,614
Diversion Wind Energy LLCBaylor201726,660
Blue Summit III WindHardeman200748,038
Raymond Wind Farm, LLCWillacy200676,290
El Algodon Alto Wind Farm, LLCSan Patricio200650,517
Papalote Creek II LLCSan Patricio200502,662

Source: EIA Forms EIA-860 and EIA-923, 2025.