Las Lomas Wind Project is a 202 MW wind power plant in Zapata County, Texas, operated by Engie North America, and it generated 582,906 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 51st percentile of U.S. wind plants. By 2025 generation it ranks 1,159th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

202 MWNameplate capacity
33%Capacity factor, 2025, 51st percentile, on 202 MW net summer
0.1%Of TX generation, 2025
5 yearsAverage generator age, by MW

How hard does the Las Lomas Wind Project plant run compared with other wind plants?

The Las Lomas Wind Project plant had a capacity factor of 33% in 2025 on 202 MW of net summer capacity, the 51st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 120 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Las Lomas Wind Project33%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Las Lomas Wind Project plant generating more or less than last year?

Generation at Las Lomas Wind Project rose 11.9% from 2024 to 2025, from 520,768 MWh to 582,906 MWh. Through August 2026 it is running 1.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024520,768
2025582,906
2026 through August451,587
2025, same months445,239
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202663,085
July 202673,045
June 202660,180
May 202648,720
April 202654,723
March 202670,698
February 202641,309
January 202639,827
December 202530,102
November 202543,817
October 202535,878
September 202527,870
August 202543,487
July 202573,674
June 202564,443
May 202550,835
April 202571,903
March 202560,529
February 202542,499
January 202537,869
December 202437,761
November 202442,744
October 202435,610
September 202428,660
August 202438,561
July 202445,869
June 202446,168
May 202453,256
April 202457,198
March 202448,621
February 202450,310
January 202436,010

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Las Lomas Wind Project plant?

Las Lomas Wind Project made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 288th largest of 1,023 plants in Texas, the 1,488th largest of 14,327 in the U.S. and the 245th largest of 1,358 wind plants. By 2025 generation it is the 224th largest of 816 generating plants in the state.

Las Lomas Wind Project within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)202195,9660.1%
Generation (MWh)582,906592,896,1760.1%
Wind capacity (MW)20243,9420.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Las Lomas Wind Project plant, and when do they retire?

1 operable generator totals 202 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1202100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WTGOperatingOnshore Wind Turbine2022020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Las Lomas Wind Project plant?

Las Lomas Wind Project, LLC is the only joint owner reported for Las Lomas Wind Project, with 100.0%. Engie North America operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Las Lomas Wind Project plant?

Las Lomas Wind Project is in Falcon, Zapata County, Texas, at 26.6984° N, 99.0575° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Las Lomas Wind Project's 202 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Penascal II Wind Project LLCKenedy202286,270
Los Vientos Wind 1BCameron202370,330
MestenoStarr202609,873
Las Lomas Wind ProjectZapata202582,906
Stella Wind FarmKenedy201588,614
Diversion Wind Energy LLCBaylor201726,660
Blue Summit III WindHardeman200748,038

Source: EIA Forms EIA-860 and EIA-923, 2025.